My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-BOARD OF HEALTH
TownOfMashpee
>
Town Clerk
>
Minutes
>
BOARD OF HEALTH
>
1990-1999
>
1998
>
1998-BOARD OF HEALTH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:17:38 PM
Creation date
11/17/2016 3:22:27 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
12/31/1998
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES January 8, 1998 6 BOARD OF HEATLH <br /> more stringent for nitrogen or sensitive areas like zone 1 and you're saying sorry you have <br /> to get that system out of there now, you could use it for that." <br /> Mr. Doherty commented, "I would imagine the County would really embrace this <br /> because this would perpetuate the program." <br /> Mr. Gottlieb stated, "Town meeting must vote to incur a debt trust." "We have <br /> worked out a language for the towns." "The Board of Health would sponsor the article." <br /> 3.) Cony of letter from M McGrath to DEP re: Dente. Systems (F.Y.I.) - <br /> Acknowledged. <br /> 4.) Emergency failure certification_ 521 Cotuit Road - Mr. Evans stated, "I inspected <br /> the site and found the leach pit full." <br /> Board members forwarded their signature's to the "Emergency Repair <br /> Certification" form. <br /> 5.) Letter from L Thomas re� 39 Popnonesset Island Road <br /> Mr. Michael Borselli, P.E. was in attendance to request a variance from the Board. <br /> Mr. McQuaid relayed, "This system required significant variances such as depth to <br /> groundwater." "The Board did request the engineer to approach the homeowner to at <br /> least consider an alternative leaching facility unless they could prove some sort of <br /> hardship." "The property owner has forwarded a letter to the Board requesting their <br /> reconsideration of an earlier vote." <br /> t <br /> Mr. Borselli stated, "The homeowner is expressing a financial hardship." "We <br /> applied for relief from the 5' separation to groundwater to 4', and a local variance which <br /> requires 4' of naturally occurring permeable soil between the bottom of the leaching <br /> facility and groundwater." "The dwelling was constructed in the late 1960's well before <br /> the regulation was in place." "We cannot get 4' of permeable material between high <br /> groundwater and the bottom of the septic system." "It's not physically possible to meet <br /> that requirement." "If we do a strip-out, which is allowed by Title V, we will in effect get <br /> what we would have in other areas where nature placed out-wash soils." "The current <br /> system has failed and is in groundwater." "We propose to replace the existing 1000 gallon <br /> tank with a 1500 gallon tank and install a whole new leaching facility." "We felt this <br /> system would be approved because we are upgrading the old system which is <br />
The URL can be used to link to this page
Your browser does not support the video tag.