Laserfiche WebLink
If any changes are made, project must be <br /> resubmitted through both plan review and design <br /> review. <br /> ZBA cannot alter use group approved from previous <br /> boards without approval from these committees. <br /> Building Permit Process <br /> Sign offs in the following order <br /> Ian Review <br /> Design Review <br /> ZBA <br /> Town Planner <br /> Health <br /> Conservation <br /> DPW <br /> ZBA <br /> Water District <br /> Fire <br /> Shop drawings submitted by the mechanics after <br /> building permit is issued <br /> Fire alarm <br /> Fire Sprinkler <br /> Rough and final inspections to be coordinated with <br /> the fire department <br />