Laserfiche WebLink
- - - - - - - - - - - 111e �'o - - <br /> D R A <br /> MASHPEE HIGH SCHOOL <br /> DRA 93024 <br /> Program <br /> 7-26-93 <br /> BUILDING PROGRAM <br /> ULTIMATE BUILD OUT <br /> Base: 155 sf/student x 1350 students= 209,250. <br /> Excess: Possible increase for "allowable areas <br /> in excess of base" (±5%) * 10.450. <br /> TOTAL 219.700, gross square feet <br /> INITIAL PHASE Mie Max. <br /> Base: 155 sf/student x 1000 students: 155,000. 155,000. <br /> • Expanded <br /> Core: (see breakdown) 13,625. 27,990. <br /> Excess: Possible approved areas (±10%) * 7.750. 7.750, <br /> TOTAL 176,375. 190,740. gross square <br /> feet <br /> PROJECT BUDGET <br /> ULTIMATE (1350 students) <br /> 219,700 sf x $145.25/sf = $31,911,425. <br /> INITIAL PHASE (1,000 students) <br /> Minimum <br /> 176,375 sf x $145.25/sf= $25,618,468. <br /> Maximum <br /> 190,740 sf x $145.25/sf= $27,704,985. <br /> * Allowable areas in excess of base building may include areas for the following uses: Special Needs, <br /> T.B.E., Remedial Resource, Collaborative and Community. <br />