My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993_001-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1993
>
1993_001-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:42:51 PM
Creation date
11/17/2016 3:30:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST PLANNING PROCESS <br /> • The client has the building program <br /> prepared after the feasibility study <br /> Is completed. <br /> The cost consultant prepares the program <br /> budget and the project cost limits. <br /> The program budget is approved by <br /> the client and the architect. <br /> The schematic design is prepared by The first cost plan is prepared by the cost <br /> the architect (including design consultant based on the schematic design. <br /> alternatives). <br /> The architect prepares the detailed design within <br /> cost and program parameters. <br /> the first cost plan Is updated and detailed <br /> • elemental costs are determined. <br /> If design is within cost limits and If design exceeds cost <br /> meets program requirements: OR limits: <br /> Alternate designs are produced for elements <br /> over cost targets. <br /> Higher costs are accepted and the client's cost <br /> limits are revised. <br /> The architect prepares working <br /> drawings and specifications Interim cost checks are made <br /> (contract documents). by the cost consultant. <br /> If over cost limits revise contract Final cost estimate by the <br /> documents. cost consultant. <br /> • <br /> Proceed to bid project. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.