Paul asked Linda, who has seen CIC's statement of work,what she thinks is a realistic date for <br /> completion? <br /> Linda said there is one item that is 300 hours. She is not sure what the Committee means by <br /> finished. CIC is putting up a skeleton of a network then the teachers, administrators and staff <br /> will fill it in and start to use it. There is a blurry line between completed product and what will <br /> be working for the students. <br /> Paul asked contractually, has CIC met their obligation to get us up and working? <br /> Linda said the school is up and working. This is where you want to be. Let them finish <br /> installation and hand over to the people who are educated or else it will not trickle down to the <br /> kids. It should be handed over to a team that understands how to use it. <br /> Paul said school vacation is Feb. 17-21. We need a real dedication that the system will be <br /> running and CIC will be substantially complete by Feb. 22 d. We will not put up with another <br /> delay. He wants this brought to a resolution before the students get back. <br /> Steve said there needs to be education. One mistake can be very costly. People are unplugging <br /> printers and moving them and moving machines. <br /> Realistically we will continually have some problems and it will be difficult to handle unless <br /> there is someone here to deal with it. <br /> Paul wants to be sure Steve, Mike Kirwin and Computers Without Fear have a performance test <br /> to determine if CIC has met their requirements. <br /> Mike Kirwin said he should be able to recommend that the subs are substantially complete by <br /> February 24'". Edgestar, Whicom,National Telecom- we are waiting for voice mail training. <br /> That will be conducted on February 10's <br /> Merrimack is on hold re: Internet connection. CIC is in control of their own destiny regarding <br /> substantial completion. <br /> Paul said this Committee has a history of getting rid of people who don't perform. If CIC does <br /> not perform, we will entertain finding someone who will. <br /> Peter asked the breakdown of CIC's contract, labor vs. equipment. <br /> It is about 30-70 labor-equipment. The equipment has been delivered. We are waiting for <br /> service. <br /> Kevin said they are delivering service,just not as quickly as the Committee would like. <br /> Paul asked if CIC had a time frame for completion in their contract, a certain date? <br /> Mike said it was tied to the date of order and delivery. <br /> Paul asked if they have exceeded those dates? <br /> Mike said they have. <br /> Peter suggested having town counsel send them a letter. Now,they have no financial incentive to <br /> put 2 or 3 people on this job. <br /> Paul said the letter should come from SMMA as the architect in charge of the project. <br /> Paul said now that the exchange package has been found, CIC can re-visit all 202 computers. <br /> Janice explained that Dr. DeMoura has asked Computers Without Fear to join in the interviews <br /> of the network administrator position. They are reasonably close to hiring someone. <br />