My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NA-KC COOMBS SCHOOL COUNCIL
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COUNCIL - KC COOMBS SCHOOL
>
NA-KC COOMBS SCHOOL COUNCIL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:41:56 PM
Creation date
11/17/2016 3:27:26 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
School Improvement Planning Process GOAL4—TECHNOLOGY <br /> Draft Format for Action Planning: How are we going to get there? <br /> Strategic Goal Statement (What is the research base for this strategy?): <br /> To develop a data system for DRA, Reading Street and mathematics assessment results so that these results can <br /> inform instruction. This technology system will be developed by staff, building principal and network administrator <br /> to record data of individuals, class groups and grade level. <br /> Connection to District Strategic Plan (To which District Objective(s) does this Goal tie?): <br /> Goal Area 1: Academic Achievement: Objective 6: Assessment - Strategy 1: Use assessment-driven instruction <br /> to improve learning; Strategy 2: Develop course/grade level common assessments; Strategy 3: Review grading <br /> systems/use technology. <br /> Evidence of Effectiveness (How will we know that this strategic goal is having the intended effect on student performance <br /> and when will it be achieved?): <br /> An organized data tracking system for kindergarten, grade one and grade two results. All staff will be responsible to <br /> utilize the technology and the program. <br /> Activities Timeframe Who Resources Evidence of Quality Update/ <br /> What specific actions By when? Start Who is involved With what required Implementation Completed <br /> need to be taken? and End dates and who is the resources and How will we know this Status/ <br /> lead person? funding? activity has been Completion <br /> implemented? date <br /> 1. Develop Nov-Dec 06 Staff, building In-house Useable tool <br /> instruments principal, resources/technology <br /> network <br /> administrator <br />
The URL can be used to link to this page
Your browser does not support the video tag.