My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/19/1996-MASHPEE HIGH SCHOOL BUILDING COMMITTEE MINUTES AND AGENDA
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
>
06/19/1996-MASHPEE HIGH SCHOOL BUILDING COMMITTEE MINUTES AND AGENDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 11:38:43 AM
Creation date
11/17/2016 3:31:07 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
06/19/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f♦ <br /> They are doing two things : assessing the existing conditions , for <br /> leaks, mold and developing a directive for Stone to implement . <br /> When Joel receives the final version, he will get copies to the <br /> Committee. <br /> Steve asked if Stone is doing a lot of mitigation already? <br /> Joel said they are. <br /> Merry Sue asked what systems are on? <br /> Joel said the big de-humidifier is running as well as 4-5 small <br /> ones , heat is running. <br /> Peter asked, after substantial completion, how do we get Stone to <br /> keep the de-humidifier going , after the flooring is down? <br /> He would like to see the dehumidifier running until Sept. 1 . <br /> Joel said contractually, Stone cannot be held to that. <br /> After substantial completion, it is the owner' s responsibility to <br /> run the mechanical systems. <br /> Peter said this summer there will still be a lot of moisture in <br /> the building , it the concrete. He does not want the carpet to be <br /> wet in August because we didn't get the moisture out. <br /> Joel said he can look into it but he is not sure how you can <br /> require it . <br /> Peter asked how much it will cost to run the dehumidifier for 1 <br /> month? <br /> Tom will find out. <br /> Janice said even it we have to pay for it it is to our advantage . <br /> CHANGE ORDERS <br /> Joel presented a change order for $19 , 383 for 6 items : <br /> - add plumbing piping in cafeteria for roof drain. <br /> - locate exhaust duct work in classroom Al , due to space <br /> restriction in corridor. <br /> - provide additional traffic signs throughout the site , <br /> recommended by the sign installer. <br /> - additional plumbing piping in science case work <br /> - additional filler fabric on leaching field at stp, asked for by <br /> Elias McQuaid. <br /> - add floor drain for dishwasher in nutrition lab. <br /> Peter asked why these are coming up now? <br /> Joel explained the vertical rise was now show on the plan for the <br /> cafeteria roof drain so it was added. <br /> Peter asked if we pay for architect ' s time to design this? <br /> Joel said no . <br /> The duct work, the contractor asked to relocate it to allow more <br /> space in the corridor. SMMA agreed it worked better. The change <br /> in price is for the additional run of duct work. footage . <br /> Steve said all the changes will be reviewed at the end of the <br /> project to see who owns what. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.