My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/19/1996-MASHPEE HIGH SCHOOL BUILDING COMMITTEE MINUTES AND AGENDA
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
>
06/19/1996-MASHPEE HIGH SCHOOL BUILDING COMMITTEE MINUTES AND AGENDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 11:38:43 AM
Creation date
11/17/2016 3:31:07 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
06/19/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASHPEE HIGH SCHOOL BUILDING COMMITTEE MEETING MINUTES <br /> MONDAY, JULY 8 , 19996 <br /> SENIOR CENTER <br /> Present : Paul Griffin, Merry Sue Ahlgren, Steve Greelish, Peter <br /> Dinizio <br /> Also Present: Jim Byrne <br /> The Committee reviewed the plans for the additional fields, road <br /> work and site lighting. <br /> This bid also includes irrigation of these fields. <br /> The fence is included in the base bid. It is an 8 ft fence <br /> around the perimeter of the football field with a 4 foot one <br /> around the inside of the track. <br /> Paul would like to see another gate added. <br /> The sidewalk along the entry is a requirement of the Cape Cod <br /> Commission. <br /> Lighting is for the football fields , basketball courts and tennis <br /> courts. <br /> The State wanted to see 4 lanes on Old Barnstable Road, so the <br /> design now includes 4 lanes. It required some takings. <br /> ** Paul made a motion to forward to the Selectmen for their <br /> approval the bid from PA Landers for additional site work <br /> to include additional fields, field lighting and road <br /> work, for $644 , 000 (Base bid plus 3 alternates) . Merry <br /> Sue seconded the motion. <br /> Discussion: <br /> Is the road work a good price? <br /> Paul said it is. <br /> ** All members were in favor 4-0** <br /> CCD #18 for the curtain for the auditorium, additional air <br /> conditioning for auditorium and lighting in the TV studio of <br /> $40 , 000 . Paul explained that Joel feels the TV studio lighting is <br /> an integral part of the job. <br /> Steve said there is no way it should cost $40 , 000 . We will have <br /> to do it when we do the other lighting. <br /> Merry Sue wants to see details . <br /> Paul said Joel feels it is important to do it asap. There are <br /> ceiling changes , pole rigging , a lot of circuits. He does not <br /> disagree with Steve, it is a lot of money. <br /> He will take $40 ,000 out of CCD #18 . <br /> Paul suggested having Mike talk to the Committee about what <br /> lighting is required for each of these locations. <br /> Paul spoke with Manny Tavares today. He feels the 44 . 8 million <br /> will only be slightly under. It will depend on what we select <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.