My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NA-MASHPEE HIGH SCHOOL PROJECT MANAGEMENT
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
>
NA-MASHPEE HIGH SCHOOL PROJECT MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 4:04:24 PM
Creation date
11/17/2016 3:31:09 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti <br /> STONE <br /> Stane Building cmnpany <br /> Subcontractor/Supplier Responsibility Listing <br /> CODE DESCRIPnON SUB S NTRAC OR/ AMOUNT <br /> PPLIER <br /> 01000 GENERAL CONDTTIONS STONE <br /> 1 Performance&Payment Bond STONE 98400 <br /> Subcontractor Bonds STONE 19005 <br /> Insurance Preromms STONE <br /> 2 MobrT®tim STONE <br /> Perconstruction Activities Cost STONE 61000 <br /> Project Accounting/Office Support STONE 60000 <br /> Purchasing Department STONE 50000 <br /> 3 Field Offices STONE <br /> Setup STONE 32000 <br /> Maintamence STONE 63000 <br /> Removal STONE 5000 <br /> 4 Sopervisim STONE <br /> Project Manager STONE 130000 <br /> Project Superintendent STONE 130000 <br /> Assistant Project Manager STONE 75800 <br /> 5 Safety-3 hrs/week R 65 weeks STONE 7000 <br /> 6 Temporary Barriers STONE 8000 <br /> 7 Project Sign STONE 2500 <br /> 8 Construction Fence STONE <br /> Install STONE 17000 <br /> Remove STONE 2000 <br /> 9 Utilities Cost STONE <br /> Water STONE 3750 <br /> Temporary Electric Service and Equipment STONE 28250 <br /> Electric Power Consumption STONE 14000 <br /> 10 Engineering BSS Design 9600 <br /> 11 Hoisting - STONE 5000 <br /> 12 Scaffolding STONE 20400 <br /> 13 Dumpsters - STONE 40000 <br /> 14 Teraporary Beat&Protection STONE <br /> Equipment STONE 15000 <br /> Fuel STONE 63500 <br /> 15 Signage STONE 1000 <br /> 16 Final Clean Up STONE 28000 <br /> 17 Temporary Toilets STONE 5000 <br /> 18 Progress Photos Abbot&Boyle 8000 <br /> 19 Coordination Drawings STONE 20000 <br /> 20 Record As-Build Drawings STONE 5000 <br /> 02100 Spe Preparation Lawerace Lynch <br /> Building LaweruceLynch 31400 <br /> Puking and Roads Lawer uce Lynch 33832 <br /> Ballfields Lawer ace Lynch 34632 <br /> Soccer Fields Lawemce Lynch 21117 <br /> Football Field Lawemce Lynch 28719 <br /> 02115 Site Clearing <br /> Building Letomnaa Products 47500 <br /> Parking and Roads 1.etomoau Prodi 51100 <br /> Ballfields Laiomnem Products 52250 <br /> Soccerfields I.damnaa Prodocti 31850 <br />
The URL can be used to link to this page
Your browser does not support the video tag.