Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
FAX TRANSMITTAL Ch (oS MW a <br /> 153 Milk Street <br /> Boston, MA 02109-4809 <br /> Tel 617 7379339 <br /> Fax 617 7370540 <br /> Mashpee High School Project Management <br /> To Building Committee Sheet 1 of 2 <br /> Attn. Peter Dinizio, Chairman <br /> CC. - <br /> From Tom Wren <br /> Date September 28, 1994 <br /> Re Decisions Required by the SMMA for Design Development Completion. <br /> Please find attached the most recent list received from SMMA, dated September 14, 1994 <br /> which identifies items requiring direction by the Building Committee in order to complete the <br /> Design Development phase. <br /> The list revises an earlier list which was appended to the Value Management Status <br /> Sheets, Revision No. 4, circulated under cover of Chartwell's letter dated September 20, <br /> 1994. <br /> For those items in respect of which a decision is required the following is the position on <br /> each as understood by Chartwell. The item references below relate to the annotated <br /> numbers inserted in the left hand margin of SMMA's list. The suggested action source <br /> appears in parenthesis. <br /> 2. On August 25, 1994 SMMA submitted a preliminary kitchen plan and equipment <br /> layout for approval. The design reflects the Educational Specification population <br /> of 1180 students. 'Canteen' is to confirm that the existing design can accommodate <br /> 3000 students. ['Canteen' through Paul Griffin] <br /> 4. Refer to SMMA letter dated July 29, 1994, Page 3, Item No. 2. [FF&E] <br /> 6. Refer to memorandum dated July 6, 1994 from Furniture Subcommittee to School <br /> Building Committee. [FF&E] <br />