My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989 JAN-JUN-ZBA APPEALS
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1980-1989
>
1981
>
1989
>
1989 JAN-JUN-ZBA APPEALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:14:01 PM
Creation date
11/17/2016 3:38:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�aE?ONj�'ofM <br /> e <br /> j IIfUn of c ns4prr <br /> Qiyti�1^,_.,_� �h"• P. O. BOX 1108 - <br /> nneleco MASHPEE. MA 02649 <br /> BOARD OF APPEALS <br /> F DECISION <br /> FOR A SPECIAL PERMIT <br /> I <br /> RE: Petition of John Morgan for a Special Permit Case: SP-88-11-108 <br /> A Petition.was filed by John Morgan of Centerville, Massachusetts <br /> for permission to construct a stairway and fixed pier in an R-5 zoning <br /> district on property located at 111 River Road (Map 89, Lot 3) Mashpee, <br /> Massachusetts (Owners of Record: Wm. Van Herwade and John L. Morgan) . <br /> Notice was duly given to abutters in accordance with Massachusetts <br /> General Laws Chapter 4OA. Notice wasgivenby publication in the Falmouth <br /> Enterprise, a newspaper of general circulation in the Town of Mashpee on <br /> December 28, 1988 and January 4, 1989. <br /> A public hearing was held on the petition at the Mashpee Town Hall <br /> on Wednesday, January 11, 1989 at 7:30 p.m. at which time the following <br /> members of the Board of Appeals were present and acting throughout: <br /> William J. Hanrahan, Cheryl A. Hawver and Michael A. Makunas. The <br /> hearing was continued on March 22, 1989. <br /> George Thorng of Arrow Engineering present plans for a fixed pier <br /> 8' x 30' . Abutters present expressed concerns about the size and construction <br /> methods for the pier. Mr. Morgan agreed to revise plans to reduce the <br /> size of the pier. <br /> The revised plans were presented on March 22, 1989. The fixed <br /> pier has been replaced with a 6' x 12' float and sonar tubes have been <br /> replaced with treated wood posts on the bank. A letter was received <br /> from the Mashpee River Woodlands Committee approving the revised plan. <br /> The Shellfish Commission and Conservation Commission had no objections. <br /> 1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.