Laserfiche WebLink
I: <br /> 3. 5 Whenever any uncertainty exists as to the exact location <br /> of a boundary line, the location of such line shall -be <br /> determined from the scale of the map by the building jJ . <br /> inspector. 3 <br /> f <br /> SECTION 4: ` <br /> f d � <br /> APPLICATION OF REGULATIONS <br /> I <br /> 4.1 . No buildings shall be erected or used, and no land shall !; <br /> be used or divided unless in conformity with the regulations ` <br /> of this By- Law. All other buildings and all other uses of <br /> land or of buildings are hereby expressly prohibited, except <br /> those already lawfully existing which by the provisions of <br /> this By- Law become lawfully nonconforming. I is <br /> T <br /> 4. 2 . When a lot is transected by a zoning district boundary, and rl �+ <br /> in part in the adjacent municipality, the provisions of. <br /> this By-Law shall be applied to the portion of such lot in HF <br /> the Town of Mashpee in the same manner as if the entire lot <br /> were situated in Mashpee. <br /> 4. 3.. When a lot is transected by a zoning district boundary, the <br /> regulations of the By-Law shall be applicable to the larger ;I ! <br /> part by area of such lot may also at the option of the lot <br /> owner be deemed to govern in the smaller part beyond such <br /> zoning district boundary but only to an extent not more ' ! <br /> than thirty (30) linear feet in depth beyond such zoning j <br /> district boundary. <br /> 4, 4 No building shall be erected except on a lot fronting on <br /> a street and there shall be not more than one principal <br /> building on any lot, except as allowed under this By-Law. <br /> 4.5 . Land within the lines of a street on which a lot abuts shall <br /> not be counted as part of such lot for the purpose of ! ! ' <br /> meeting the area requirements of this By-Law even though <br /> q <br /> the fee to such land may be in the owners of abutting <br /> 14� <br /> lots. <br /> j l,T <br /> 4.6 Any land taken by eminent domain, or conveyed for a <br /> public purpose for which the land could have been taken <br /> by eminent domain, shall not be deemed to be transferred, <br /> in violation of the land area, width, and space provisions <br /> of this By-Law. <br /> 4. 7 Construction or operations under a building permit or <br /> special permit shall conforms to any subsequent amendment � <br /> of the Zoning By-Law unless the use or construction is <br /> commenced within a period of not more than six months <br /> after the issuance of the permit and in cases involving <br /> ' I <br /> } ' <br /> -7- <br /> j <br /> I ;;Y <br /> I <br />