My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1966-1982-ZONING BY-LAWS
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BY-LAWS
>
1980-1989
>
1982
>
1966-1982-ZONING BY-LAWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:11:08 PM
Creation date
12/19/2016 9:59:38 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BY-LAWS
Meeting Document Type
Minutes
Meeting Date
12/31/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.39 To delete section 9.39 and add a new section <br /> 9.39 as follows: <br /> r_ 9.39 Building Permits — The developer shall <br /> submit to the Building Inspector prior to the issuance <br /> of a building permit with his application for a build- <br /> ing permit a copy of the approved subdivision plan <br /> together with evidence that the project phasing <br /> schedule is being adhered to by the developer. <br /> 9.391 To delete section 9.391 and add a new section <br /> 9.391 as follows: <br /> 9.391 Changes or deviations from plans,schedules <br /> I ' <br /> and phasing may be made only with the unanimous <br /> approval of the Planning Board. <br /> Moderator: I will recognize the Chairman of the Planning Board <br /> and the Growth Review Committee, it_ichard Terry. <br /> � rir Terry: I would like to amend the following. <br /> I <br /> 9.3748 Septic and well locations for each unit served, generalized <br /> landscape plan including treatment of a typical structure, <br /> entrance ways and major signs. <br /> l 9.3749 In addition, a site visit to be conducted by applicant with <br /> representation from the Planning Board and Board of Appeals, <br /> may be required, if so determined by either Board. A water <br /> quantity and quality test every two acres. <br /> -,:A <br /> 9.3825 Road profile plans on engineering plans showing utilities <br /> 3 including water supply, quality and quantity for every two �I <br /> i acres, sewerage disposal, electrical service, storm drainage <br /> (including capacity) and other pertinent information required 1, <br /> by the Planning Board. JJ <br /> i % <br /> 4.39 Building Permits - The developer shall submit to the Building <br /> Inspector prior to the issuance of a building permit with his j <br /> application for a building permit, a copy of the approved sub- <br /> division plan together with evidence that the project phasing <br /> schedule is being adhered to by the developer. Also proof <br /> that the Septic and Well permits have been issued. <br /> I• I <br /> I,I <br /> i� <br /> i! t <br />
The URL can be used to link to this page
Your browser does not support the video tag.