My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-BOARD OF SELECTMEN
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
1990-1999
>
1999
>
1999-BOARD OF SELECTMEN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 2:41:50 PM
Creation date
12/19/2016 10:13:38 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
12/31/1999
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r; <br /> Board of Selectmen <br /> Minutes 3 <br /> January 11, 1999 <br /> APPOINTMENTS AND HEARINGS <br /> Public Comment: <br /> None at this time. <br /> Cranberry Bog Update_ <br /> Michael Minor of the MMR Installation Restoration Program and Tom Simoniak <br /> of Jacobs Engineering were present to update the Selectmen on the FS-1 <br /> Quashnet River Bog Separation Project. <br /> Mr. Minor distributed a handout of the pilot test project that proposed to <br /> implement and evaluate the performance of an extraction, treatment and <br /> discharge system to intercept EDB contaminated groundwater at the leading <br /> edge of the FS-1 plume. <br /> In addition, the pilot bog separation project will protect human health by <br /> reducing the risk from EDB in surface water, groundwater, and/or cranberry <br /> crops while minimizing impacts to the ecological systems informed Mr. Minor. <br /> Existing cranberry operations are expected to be protected in this process. <br /> Water management structures will be constructed to decrease the potential <br /> risk of crop contamination by separating the river channels from the commercial <br /> cranberry bogs. <br /> In phase one of the project proposal, extraction wells will be installed. A <br /> berm will be constructed on the eastern side of bog K2 and along the north side <br /> of bog K6 to separate the upwelling of the groundwater containing low levels <br /> of EDB. The third phase of the project will expand the southeast side of bog K6 <br /> to mitigate for loss of bog K5 and berms. <br /> It was noted that the one year pilot test project will not influence the native brook <br /> trout habitat. A public meeting is scheduled on Thursday, January 21, 1999 in <br /> Town Hall to further educate the citizens on this matter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.