My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 JUL-DEC-BOARD OF SELECTMEN
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
2000-2009
>
2000
>
2000 JUL-DEC-BOARD OF SELECTMEN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:18:22 PM
Creation date
12/19/2016 10:14:04 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
12/31/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> Board of Selectmen <br /> Minutes <br /> August 7, 2000 <br /> APPOINTMENTS AND HEARINGS: <br /> Vanasse Hangen Brustlin: <br /> Conceptual Plans for Great Neck Road North/Route 130: <br /> Vanasse Hangen Brustlin representatives Joseph Mangi and Paul <br /> Nauyokas were present to review conceptual plans relative to <br /> improvements to the Great Neck Road/Route 130 intersection project with <br /> the Board of Selectmen. Greg Taylor, Director of Public Works was in <br /> attendance. <br /> Discussion followed with respect to the conceptual alternatives. Concept <br /> No. 2, the traffic signal system control with modifications was deemed the <br /> most appropriate for the subject site location. The Board related concern <br /> with respect to accessing the existing residential site,the country store,the <br /> future memorial park and emergency access and egress. It was suggested <br /> that the land development firm review the parking area configuration <br /> when a definitive preliminary design is being developed. <br /> Motion made by Selectman Marsters to accept conceptual design No. <br /> 2,traffic signal system control with modifications, and to reasonable <br /> reconfigure the residential driveway access. <br /> Motion seconded by Selectman Green. <br /> VOTE: Unanimous. 5-0. <br /> VHB—Contract Amendment#2: <br /> The Director of Public Works recommended the Board approve Contract <br /> Amendment No. 2, Labor$5250 and Expenses $250 to VHB for work <br /> associated to the Route 130/Great Neck Road North Transportation <br /> Improvement Project. <br /> Motion made by Selectman Marsters to approve Contract <br /> Amendment No. 2 with Vanasse Hangen Brustlin,Inc. in the amount <br /> of$5,500 for work associated to the Route 130/Great Neck Road <br /> North Transportation Improvement Project as recommended. <br /> Motion seconded by Selectman Taylor. <br /> VOTE: Unanimous. 5-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.