My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/18/2013 BOARD OF SELECTMEN Minutes
>
3/18/2013 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 11:46:15 AM
Creation date
9/29/2017 11:44:37 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
03/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Board of Selectmen <br /> Minutes <br /> Monday, March 18, 2013 <br /> NEW SNS: <br /> Statement of Interest—Massachusetts Sch of uildi AM!-OPAY—Re a=r ien <br /> Re ovation.or Modernization of School FggLfiq Systems uashnet : <br /> Motion made by Selectmen-Taylor to approve submission of the Statement o <br /> Interest to MSBA to pursue their grant opportunity to assist with the <br /> Quashnet School renovation project. <br /> Motion seconded by Selectmen Cabalane. <br /> VOTE: Unanimous. -o. <br /> Roll Call Vote* <br /> Selectman Riebardson,yes Selectman Sherman,yes <br /> Selectman Taylor,yes Selectman Cahalane,yes <br /> Selectman o"Raga,yes Apposed,none <br /> Notification of Future 'ticDetours—Great Neck Road forth: <br /> �r�i ��/�rri.4 �r � ■Y i i .r-. 4ry=*ter-� <br /> A detour planned for the Great Neck Road North construction-project was <br /> detailed by the Director of Public Works a .d outlined in her memorandum to the <br /> Board dated March 1 , 20 11 <br /> Construction is ahead of schedule and should remain on task for'completion prior <br /> to the Memorial Day weekend. In April,the traffic signal at the intersection of <br /> Lowell Road is planned to be installed. It is anticipated the milling and <br /> resurfacing of Great Neck Road North would commence on May 13-17 and on <br /> May 20-24. ung this time,there will be o detour to northbound tic onto <br /> Mcetinghuse Road. The detour would only occur during construction hours,and <br /> two-way truffic would be permi <br />
The URL can be used to link to this page
Your browser does not support the video tag.