My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/12/2009 ENVIRONMENTAL OVERSIGHT COMMITTEE Minutes
>
2/12/2009 ENVIRONMENTAL OVERSIGHT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2017 1:40:13 PM
Creation date
11/21/2017 1:39:48 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ENVIRONMENTAL OVERSIGHT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
02/12/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br /> Environmental Oversight Committee <br /> Minutes <br /> February 12, Zoo <br /> OLD BUSINESS; <br /> Santuit-fond RFP Update: <br /> M <br /> The Town is in the process of completing the grant application to secure <br /> funding for the Santuit Pond Diagnostic Study through the state Office of <br /> Energy and Environmental Affairs for funds recovered from the Textron <br /> Systems Corporation,Natural. Resource Damages Assessment and <br /> Restoration Program Fund. <br /> Under the guidelines of the grant, the proposed project must restore, <br /> replace, and/or acquire the equivalent of natural resources or natal <br /> resource services relating to groundwater that-vias injured by the release of <br /> hazardous substances from and/or at the Massachusetts Military <br /> Reservation . <br /> dough this grant opportunity, the Town i's seeking funding to cover the <br /> costs associated to the diagnostic study, work to be performed by the <br /> ENSR Corporation of Sa.gamore Beach,M.A. The 12-14 north project is <br /> estimated to cast$52,000. <br /> In conjunction with the E C Committee,the Selectmen's Office is <br /> working with the Planning, Health, GIS and Conservation Departments to <br /> draft the project proposal narrative for the Natural Resource Damages <br /> Fund—Groundwater Restoration Project application. The deadline for the <br /> grant submission is March 11, 2009. <br /> A.draft article is also being prepared for the May 2009 Special Town <br /> Meeting warrant to secure funding to procure the services of ENSR if <br /> grant funding is not attained. To date,the exact amount of ceding to be <br /> requested for the warrant appropriation is not kaon, but will be verified <br /> t the next EC Meeting. The ENSR Corporation submitted a proposed <br /> cost of$51,100 for their services. <br /> An in-depth discussion followed regarding the project proposal a <br /> described by ENSR for the diagnostic study of the 164 acre shallow fettle <br /> Bole pond. The pond suffers from nutrient over-enrichment and is listed <br /> the Clean Water Act"Massachusetts Integrated List of Waters" in <br /> Category 5, waters requiring a TMDL. Pollutants needing a TML (Total <br /> Maxi* um Dai <br />
The URL can be used to link to this page
Your browser does not support the video tag.