My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/9/2009 ENVIRONMENTAL OVERSIGHT COMMITTEE Minutes
>
7/9/2009 ENVIRONMENTAL OVERSIGHT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2017 1:50:00 PM
Creation date
11/21/2017 1:49:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ENVIRONMENTAL OVERSIGHT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
07/09/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fk <br /> ^ � <br /> 46 <br /> sa ntuit Pond Diagnostic Study Progress Report <br /> rt <br /> Prepared for the Town of Mashpee and the Mashpee Environmental Oversight Committee <br /> Prepared by AECOM Environment 9 July 2009 <br /> Progress to date: <br /> * Data gathering, r view, and assimilation in progress) <br /> • Attend project kick-off meeting with initial site inspection (June 11 <br /> 0 Coordination with MA DEP, MA DPH, Town of Mashpee (Shellfish constable <br /> Mashpee Department of Health), SMAS' Ponds& Lakes volunteer monitoring Ed <br /> Baker) to ensure no duplication of study efforts <br /> o Conference call attended on June 30 <br /> • Coordination with MA DEP with sampling CSA practices so that our field efforts can b <br /> used for TM DL submitted to EPA <br /> • <br /> Coordination with volunteer pond resident who will be p rforming'aquatic bird use <br /> surveys during the spring and summer of 2099 <br /> • Coordination/preparation for field work (waiter quality and sediment quality laboratory <br /> coordination, scheduling staff, securing equipment) <br /> • <br /> Preparation of QAWP in progress (completion targeted for week of July 13 <br /> Performed site visit on to observe and photo-document conditions at northern-most <br /> cranberry bog pond inlet(June 26) <br /> Next steps in project: <br /> * Fiat field sampling visit tentatively scheduled for the week of July loth. This maybe <br /> pushed bank to the week of duly 27th due to weather and/or scheduling issues. <br /> * contact cranberry bog operators <br /> Schedule with volunteers to set up cranberry bog monitoring program. <br />
The URL can be used to link to this page
Your browser does not support the video tag.