My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/27/2016 CAPITAL IMPROVEMENT PROGRAM Minutes
>
7/27/2016 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2017 5:05:22 PM
Creation date
12/19/2017 1:37:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
07/27/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
To, Town of Mashpee Department of Public Works <br /> - Ti� Y�• y <br /> 350 Meetinghouse load <br /> ate, <br /> Mashpee, Massachusetts 02649 <br /> Tefephone - (508)539.1420 <br /> faX- (508)539-3894 <br /> MEMORANDUM <br /> July 26, 2016 <br /> TO: Capital Improvement Committee <br /> FROM: Catherine Laurent, Director ", <br /> SUBJECT: Funding Request for Quashnet Window Replacement <br /> The need for replacement of the windows at the Quashnet School was identified in the Capital <br /> Needs Assessment completed in 2010. Since that time,the project has been included on the <br /> Town's Capital Improvement Program (CIP) but has not been funded. It was most recently <br /> included in the FY17 CIP. <br /> With the approval of the Board of Selectmen, the Town applied in February 2016 to the <br /> Massachusetts School Building Authority (MSBA) for a grant for replacement of the windows <br /> and doors (an application had been filed in 2013 but was not funded). On May 25th, the Town <br /> was notified that the project was invited to participate in the Accelerated Repair Program. <br /> The invitation to participate is the first step in a multi-step process. Below is a summary of the <br /> process. <br /> 1. The Town completes a schematic design/project estimate, after committing to pay 100% of <br /> the cost for this design. The MSBA will reimburse the Town approximately 38% of this cost, <br /> estimated to be around $50,000. <br /> r <br /> 2. Upon completion of the schematic design,the MSBA votes whether to fund the final design <br /> and construction. Per the MSBA staff, 98% of projects are approved for funding. <br /> 3. Within 90-days of the MSBA vote,the Town has to commit fundingfor 100% of the <br /> estimated projects costs (again,the Town would be reimbursed approximately 38%of the <br /> costs). <br /> 4. Design and then construction can proceed. <br /> On June 6th, the Board of Selectmen voted to accept the invitation to participate in the <br /> Accelerated Repair Program. On June 911, the Planning& Construction Committee voted to <br />
The URL can be used to link to this page
Your browser does not support the video tag.