Laserfiche WebLink
noted on a photo what the rack will look like. There was a brief discussion on bathroom <br /> facilities and it was noted this wasn't within the commission's jurisdiction. The Agent <br /> stated the Harbormaster and the Shellfish Constable are pleased with what is being <br /> proposed. It will increase their access and relieve congestion while accommodating <br /> passive boating access as well. <br /> No comments from the public <br /> Motion: Mr. McKay moved to approve the amendment to the Order of Conditions <br /> as discussed, seconded by Mr. Rogers. Vote 4-0 <br /> 6.15 Paul S. and Margaret K. Hovseplan, 13 Compass Circle. Proposed <br /> reconstruction of licensed float. NO] <br /> Resource Area: BSS, Land Under Ocean, LSCSP, BVW, Salt Marsh <br /> Jeff Rhyther, BSS Design, represented the applicant. He explained the proposed project <br /> is to reconstruct an existing wood pier and replace the ramp and install a larger float <br /> system into the waters of Poponnesset Creek. The reconstruction involves the removal <br /> of the upper pier structure and rebuilding the wood pier in the same footprint of the <br /> previously licensed structure. The grating will be an open design to allow for light <br /> penetration. The floats will be made of wood framing and the applicant wants to enlarge <br /> the float from 8'x16' to 8'x16' side float with a main float of 10'x30' as noted on the plan. <br /> He explained the piles will be installed from a barge and the old wood piles will be <br /> removed. He noted there will be no disturbances to the natural coastal bank or the land <br /> subject to coastal storm flowage. The Agent said the shellfish warden has no concerns <br /> and the harbormaster questioned the boat size but noted prop dredging is not allowed <br /> and the Agent stated this is a template that he puts in all docks and piers. The <br /> harbormaster also said there is enough separation from the neighbors. The Agent also <br /> noted the float's replacement of the current planking boards will help the salt marsh. He <br /> also noted this project has to go through Chapter 91. <br /> No comments from the public <br /> Pre-Post Hearing Agenda <br /> Administrative Review Request for 181 Daniels Island Road <br /> The Agent said this request is for a boulder revetment that is going to be tied into his <br /> neighbor's project. It is the same project extending through two lots. <br /> Mr. Thompson said he is here on behalf of Mr. Vanderbrook. He said Mr. Vanderbrook <br /> would like to change the wall in his area on my property at 175 Daniels Island Road so <br /> he doesn't lose his walkway. Mr. Thompson distributed some pictures. He said Mr. <br /> Vanderbrook would like to move the wall about 3 or 4 feet so he will still have access to <br /> the brick wall. He noted they are currently building the wail now. The Agent stated <br /> because the work was being proposed to push the wall outside the work limit that was <br /> originally approved that is an automatic amendment requirement to the order of <br />