Laserfiche WebLink
Matt Creighton, BSC Design, represented the applicant. He explained the proposed <br /> project is at the Popponesset Inn and involves the removal and reconstruction of an <br /> existing tent to include walkways, concrete dance floor and pathways. The project also <br /> consists of the removal of an existing concrete deck area. This area will be used for a <br /> portion of the new tent and the tent will be elevated on a deck to allow for migration of <br /> dune sand, vegetation and animals underneath. He stated they are also proposing sand <br /> nourishment for a dune enhancement area and will be planted with American Beach Grass <br /> for stabilization. He was also proposing the removal of invasive vines along the adjacent <br /> coastal bank. They are also looking to put in a handicap access ramp. <br /> The Agent noted the removal of invasives should at this time be restricted to the vines and <br /> noted there are certain times of the year the treatment should take place. Mr. Creighton <br /> said they would be treating the vines late summer. The Agent noted having the tent raised <br /> and the concrete removed will be more beneficial to the area. <br /> No comments from the public <br /> Motion: Mr. Smith moved to Close and Issue, seconded by Mr. McKay. Vote <br /> unanimous 6-0 <br /> 6:18 New Seabury Golf Club, LLC, 236 Shore Drive. Proposed installation of ADA- <br /> compliant handicap access ramp onto beach. RDA <br /> Resource Area: LSCSF, Coastal Bank, Coastal Dune, buffer to coastal beach <br /> Matt Creighton, BSC Design, represented the applicant. He explained the proposed <br /> project is to rebuild an area of the existing ramp and installing a section of handicap access <br /> ramp to the existing beach access stairs for handicap access to the beach of the existing <br /> deck. The proposed ramp will include landings as well as grading to meet proper grade <br /> to allow an easier handicapped access. Beach nourishment is also being proposed <br /> around the ramp. <br /> Comment from the public <br /> Joe spoke about his wife who has had trouble navigating her wheelchair in this area. He <br /> inquired if a mat will be placed at the bottom of the ramp to go out to the beach. Joe <br /> Pedula from New Seabury stated there will be a mat installed to enable access to the <br /> beach. <br /> The Agent noted this project is a necessary upgrade to bring it into compliance with ADA. <br /> Motion: Mr. McKay moved a negative determination, seconded by Mr. Smith. Vote <br /> unanimous 6-0 <br /> 6:21 Thomas J. and Kristin E. Murray, 118 Waterway. Proposed <br /> demolition/reconstruction of dwelling and garage; installation of a swimming pool; <br /> hardscape and landscape improvements. NOI <br /> Resource Area: LSCSF, buffer to Coastal Bank, BVW and salt marsh <br /> 5 <br />