My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/10/2016 ZONING BOARD OF APPEALS Minutes
>
2/10/2016 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 10:48:56 AM
Creation date
1/5/2018 10:36:31 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
02/10/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br />FEBRUARY Id, 2016 <br />MINUTES <br />Attorney Kirrane stated that in the past, the Board had viewed the issue of the pool and <br />patio differently than this Board is now viewing it. Attorney Kirrane also said he made a <br />conservative approach of the calculations to determine lot coverage. <br />The pool that was approved back in 2001 was 486 square feet. The proposed pool design <br />will have a 6' x 6' spa area with an infinity basin, and will be approximately 578 square <br />feet. In order to accommodate the slight increased pool size, there is a reduction in the hard <br />scape by substituting planting beds in place of the concrete masonry patio along and around <br />the pool. This design is maintaining the same degree of lot coverage that was approved <br />back in 2001. <br />Tom Bunker pointed out to the Board that the curved area on the plan is the 84 square foot <br />retaining wall moving closer toward the water, and was not on the original plan. The 84 <br />square feet area is not the entire raised patio because it includes some planting beds. <br />Chairman Furbush asked if the screened porch on the original plan is the trellis on the <br />current plan. Attorney Kirrane said the trellis and hot tub is in place of the in -ground pool <br />in the area that was approved for a pool. The plan that was approved was not the work that <br />was actually done. The Board questioned if the former homeowner had the plans approved <br />by the Building Department for the hot tub and trellis. <br />Chairman Furbush read the comments into the record from Katelyn Cadoret, Assistant <br />Conservation Agent dated February 9, 2016; "The DEP permit #SE 43-2839 for 138 <br />Waterway has NOT been recorded at the Registry of Deeds as of 219115 (today). Also, the <br />engineered plans submitted to ZBA has revisions NOT reflected on Concom's copy, <br />consisting of comments: "Added Phoenix Group Plan and Adjusted Patio Limit Dec 30, <br />2015." Per the Chapter 172 Special Conditions for SE 43-2839: 5. "Any deviations made <br />or. intended to be made from the plans cited as the Plan of Record in the Order of Conditions <br />shall require, in advance, one of the following: <br />1. An Amended Order of Conditions <br />2. A new Notice of Intent; or <br />3. An Administrative Approval from the Commission that the deviation is not so <br />substantial as to require (1) or (2) above. <br />"In any case, it's the owner's responsibility to apply for such Amended Order of <br />Conditions, new Notice of Intent, or written Commission decision." "Therefore, we cannot <br />sign off on the building permit until these issues have been resolved." <br />Chairman Furbush read Conservation Agent, Drew McManus' comments into the record: <br />dated January 29, 2016; "my comments for Feb. 10"' are that the commission has already <br />approved the work (pool replacing hot tub) at 138 Waterway ... no issues." <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.