Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br />MEETING MINUTES <br />AUGUST 24, 2016 <br />Chairman Furbush said that there are only four Board members and told Mr. Brooks that <br />if he decided to continue with the hearing, that all four members would have to vote <br />positive in order for the application to pass. He suggested that the hearing be continued <br />until September 28, 2016. <br />Mr. Bonvie made a motion to accept the continuance until September 28, 2016. Mr. Gould <br />seconded. All were in favor to accept the continuance. <br />OTHER BUSINESS <br />Mashpee Commons: To discuss the project construction progress as stated in the <br />Comprehensive Permit, Section IV. Decision and Conditions, sub -section 8.j <br />Board Member, Ron Bonvie stepped down from this discussion. <br />Mr. Feronti approached the Board and said under the Comprehensive Permit, Mashpee <br />Commons is required to give an update of the construction progress. The construction on <br />the buildings started in March. They received their final approval from Mass Housing in <br />January, and pulled their first permit in March. <br />He said there are currently three (3) buildings under construction. He pointed out on the <br />approved site plan that there are eight (8) buildings that make up Phase I A of the residential <br />expansion. In those eight buildings, 14,000 sq. ft. of commercial space, 52 units, and 13 <br />are affordable within those 52 units. The units are spread amongst the eight buildings as <br />are the affordable units. <br />There are currently three buildings under construction; building 40, 41, and 42. Building <br />40 is a modular building, and was the first foundation that was poured in 2014 to preserve <br />the permit. There are eight units in that building. The modular boxes were delivered and <br />the plan is to secure the boxes next week. These boxes are ready to be set on Wednesday, <br />August 31. There are ten (10) boxes plus a roof, so over the span of two to three days, that <br />building will be set. There is a lot of interior work required due to the design, and all the <br />kitchens have to be installed after the fact because they were on bare walls. The goal for <br />completion is December 1 st. Out of the eight units, two are affordable. <br />Building 41 was the first building that was initially started. This building is a "stick -built" <br />building, and the target for completion is mid-October with occupancy November 1". <br />There are eight, one bedroom units in this building and four commercial spaces on the <br />ground floor. Out of the eight units, two of them are affordable units. This is a traditional <br />construction project, the siding and drywall are done, and the kitchen should be done within <br />the next week. <br />2 <br />