My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2015 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
>
10/13/2015 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 10:12:52 AM
Creation date
1/10/2018 10:05:03 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COMMUNITY PRESERVATION ACT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/13/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br />Community Preservation Committee <br />Minutes <br />October 13, 2015 <br />APPOINTMENTS & HEARINGS: <br />Review of CPA Project Proposed for M4y 2016 Town Meeting - Great River Boat Ram <br />Improvement Project: <br />Catherine Laurent, Director of Public Works indicated she has been directed by the <br />Town Manager to defer any comments regarding the present application relative to the <br />Great River Boat Ramp Improvement project at this time. <br />There are questions the Town Manager would like to address, and therefore it is <br />requested the Community Preservation Committee postpone any consideration of this <br />application to a subsequent meeting. <br />Motion made by Mr. Larkin to accept the request of the Town Manager, and <br />postpone the consideration of the Great River Boat Ramp Improvement project <br />application to a subsequent meeting. <br />Motion seconded by Ms. Waygan. <br />VO'C'E: Unanimous. 5-0. <br />Roll Call Vote: <br />Mr. Halpern, yes Mr. Larkin, yes <br />Ms. Waygan, yes Mr. Shaw, yes <br />Mrs. Sherman, yes Opposed, none <br />Ms. Laurent indicated that applications may be forthcoming for two additional boat <br />ramps in town. This includes the replacement of the float structure at the Ockway Bay <br />Landing and the float replacement at the Pirates Cove Landing. <br />With permitting that is almost always time consuming, it was recommended the CPC <br />consider votes to set aside funds that would be anticipated in future years for the repair <br />and upgrade of the Town's boat ramp facilities. It was suggested the CPC consider <br />bonding as a method to appropriate funding. With available free cash in the CPC <br />reserves, it was advised this action may not be necessary. The matter was taken under <br />advisement at this time. <br />It was noted that permitting and re -design for the proposed double ramp at the Great <br />River boat ramp may take up to two years. This would include engineering, design and <br />mitigation requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.