My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/14/2015 CONSERVATION COMMISSION Minutes
>
5/14/2015 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2021 9:13:19 AM
Creation date
1/10/2018 12:55:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/14/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resource Area: Land Under Water, Fells Pond, LSCSF, BVW, Inland Bank <br />Jack Vaccaro, Vaccaro Engineering, was representing the applicants. Mr. Vaccaro <br />explained the existing property which borders to the north by Fells Pond and has <br />approximately 60' of frontage on Fells Pond. The property has a single family residence. <br />Mr. Vaccaro described the proposed work which included the construction of a wooden <br />stairway and installation of a small dock for canoe and kayak. The stairway will provide a <br />safe access down the inland bank to a landing from which the proposed dock will extend, <br />The dock is a 4 foot wide ramp and 8 foot by 12 foot float that will extend out approximately <br />30 feet beyond the water's edge. The dock will be held in place by galvanized pipes. <br />Mr. Vaccaro explained that the proposed work also includes the creation and maintenance <br />in perpetuity of a vista window that will affect 25 per cent of the width of the property to <br />promote views between the existing house and proposed dock. The vista window will taper <br />to a 20 foot width at the proposed residence and will include the area adjacent to the existing <br />foot path. The vista pruning will consist of up to 30% of the limbs per tree within the vista <br />corridor buffer; up to 20% of the saplings within the corridor may be removed; shrubs will <br />be pruned to no lower than six feet in height within the corridor. Prior to the commencement <br />of any pruning there will be an on-site meeting with the conservation agent. All other <br />portions of the buffer strip will be preserved in a natural state. Mr. Vaccaro said the vista <br />pruning will be performed in accordance with the Mashpee Conservation Commission <br />protocols. He noted that a plan prepared by Engineering Works has been provided. <br />Mr. Vaccaro also explained that the proposed stairway will span an area of inland bank and <br />bordering vegetated wetland. He also noted that Fells Pond is located within: an ACEC. <br />Fells Pond is under 10 acres and it is not considered a Great Pond so this work does not <br />require approval from Chapter 91. <br />The Agent noted that Mr. Vaccaro referred to the landing as 4' x 6' but is referred to on the <br />plan as 6 by 6 and in accordance with Town dock standards it can't be wider than four feet. <br />He requested that the plans be changed to reflect this. He said everything else is in <br />accordance with all of the vista pruning protocols and it is allowed under the law to have a <br />pathway to the -water. The float will be removed seasonally and encapsulated. <br />There was a discussion on the vista pruning and the Agent read from the Conservation <br />regulations and stated he didn't see any adverse impact to the wetland area. Mr. Vaccaro <br />made a change. on the plans indicating the change of the proposed ramp to a dimension of 4 <br />feet wide by 6 feet in length <br />No comments from the public. <br />Motion: Mr. Sweet moved to Close and Issue, seconded by Mr. Shaw. Vote unanimous <br />6-0. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.