Laserfiche WebLink
b <br /> Board of Selectmen <br /> Minutes <br /> March 23, 2015 <br /> NEW BUSINESS: <br /> DPW--Sprina 2015 Project Update: <br /> Catherine Laurent, DPW Director updated the Board on the schedule of spring <br /> projects which include the Community Park,the Great River Boat Ramp/Parking <br /> Lot Improvement project and the completion of the Mashpee Dog Park. It was <br /> noted that as a result of the snow cover and depth of the frost,work may be <br /> delayed. <br /> The DPW anticipates resuming the Community Park project in mid-April. Work <br /> includes fine grading and the paving of walkways,the construction of stone entry <br /> columns,the installation of signage,planting and mulching of areas to be <br /> landscaped and the loaming and seeding of grass areas. During this phase, light <br /> poles will be installed in addition to benches,trash receptacles, and bike racks. <br /> The public restrooms located at the Archives building will be finished. <br /> However, due to site conditions,the installation of the concrete for the pavilion, <br /> grant curbing and asphalt may not be complete unless the ground has thawed and <br /> dried sufficiently. The grand opening of the facility remains on schedule for <br /> Memorial Day. <br /> In concern to the depth of the frost and the approaching start of the boating <br /> season,the DPW Director in conjunction with a request from the Waterways <br /> Committee recommended the postponement of the ramp construction project and <br /> related installation of the dock/float system to the fall of 2015. <br /> It was noted that Chapter 91 permitting, a requirement for the dock reconstruction <br /> was filed last month. For public awareness and advance notice, it was <br /> recommended the DPW Director appropriately post the anticipated closure of the <br /> Great River Boat Ramp. <br /> The remainder of the drainage work in the parking lot is scheduled for completion <br /> in early May. At this time,work associated to asphalt paving is also planned. <br /> Currently,the DPW is completing the lot clearing at the Mashpee Dog Park. <br /> Upon completion,the contractor will complete the remainder of the project which <br /> includes site excavation,the installation of water service, fencing and gates and <br /> surfacing using rice stone. With favorable weather conditions,the concrete <br /> walkways will be poured,and the parking areas paved. Site amenities will follow. <br /> The project is anticipated to be complete by mid-June. <br />