My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/10/2015 WATERWAYS COMMISSION Minutes
>
3/10/2015 WATERWAYS COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2018 5:01:06 PM
Creation date
1/12/2018 10:08:47 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
WATERWAYS COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/10/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE WATERWAYS COMMISSION <br /> MASHPEE TOWN HALL <br /> MASHPEE, MA <br /> MINUTES OF THE MARCH 10, 2015 MEETING <br /> Chairman Ken Bates called the meeting to order at 9:03 AM at the Mashpee Town Hall <br /> in the Popponesset Meeting Room <br /> Present: Don Barton, Ken Bates, Stanton Healy, Steve Mane, Mike Richardson, Bill <br /> Taylor, Rick York <br /> Absent: Tim Leedham, Don MacDonald, Al Wickel <br /> Minutes of the January 13, 2015 Meeting: Motion made by Stan Healy to approve <br /> minutes, 2nd by Don Barton and unanimously approved. Ken noted the minutes do not <br /> reflect Bill Taylor was "Absent" at the January 13, 2015 meeting <br /> Harbormaster Report: Steve reported that many moorings and aids to navigation had <br /> been moved out of position by winter storms. It will be a challenge to get moorings and <br /> aids to navigation correctly re-positioned given the harbormaster budget ($15,000). <br /> Steve stated a budget of$25,000 is necessary to do the on-going maintenance <br /> required. <br /> There was discussion of piling designs which would minimize pilings heaving. Steve <br /> requested that a prototype of the dock proposed for the Great River Boat Ramp be <br /> available for evaluation before a the DPW issues a purchase order for materials. <br /> Shellfish Constable Report: Rick reported "no activity" as everything is frozen over <br /> Water Quality: Steve Pinard to deliver documentation to Don the third week of March. <br /> As Don will be away Steve will deliver the materials to Ken.. <br /> Public Access: Maintenance on parking lot at Great River being delayed because of <br /> weather. Discussions took place about timely completion of Great River Boat Ramp <br /> project because of adverse weather. Additional considerations discussed included <br /> whether the ramp should be a double ramp capable of launching and recovering boats <br /> at the same time. <br /> Don suggested the Waterways Commission recommend to the Town Manager, BOS <br /> and Catherine Laurent that Great River Boat Ramp project construction work be put on <br /> "hold". The reason for the recommendation is the belief that existing resources will be <br /> needed to clear the waterways of debris (destroyed docks, ramps and moorings) <br />
The URL can be used to link to this page
Your browser does not support the video tag.