Laserfiche WebLink
6:15 Jonathan J. Small and Jayne M. Singer, 40 Sturgis Larne. Proposed access NO[ <br /> staircase to existing deck and removal/reconstruction of walkover structure with <br /> seasonal pier. <br /> Resource Area: <br /> Matt Creighton, BSC Group, was present representing the applicants. He explained <br /> the proposed project is the removal of an existing dilapidated walkover structure and <br /> construction of a new walkover structure with seasonal, removal pier into Mashpee <br /> Pond: He noted the existing walkover is unusable and the old owners created a <br /> small path leading down to the pond. The proposed project would remove the <br /> existing structure and allow the existing vegetation to reestablish. The structure will <br /> be removed by hand so not to disturb the soil on the bank. The proposed structure is <br /> 4' wide and 40' long with a 4' by 8' T-end for storage. Matt Creighton stated he has <br /> submitted a mitigation plan totaling a required 80 s.f. which was determined using the <br /> Town of Mashpee regulations but is providing 300 square feet of mitigation. <br /> The Agent noted everything being proposed has no issue from the stairway down to <br /> the walkway. He noted historically the commission has not allowed in excess of 4 <br /> feet for platforms but it is at their discretion. Mitigation has been proposed for that <br /> situation. There is no vegetation where the platform is proposed. Every other part is <br /> in line with the regulations and meets the performance standards. <br /> There was a discussion on the removal of the float and the Agent noted this could be <br /> conditioned. <br /> Following a lengthy discussion regarding the placement of the stairs and platform, <br /> Motion: Mr. Gurnee moved to Close and Issue, seconded by Mr. Shaw. Mr. <br /> Gurnee, no, Mr. Rogers, no, Mr, McKay no, Mr. Anderson, no. Mr. Shaw yes. Vote <br /> 1-4 motion failed <br /> Motion: Mr. Gurnee moved to approve the plan as presented except for the unit <br /> storage area and replace it with a 4' by 4' platform at the base of the stairs and <br /> supporting the ramp down to the dock, seconded by Mr.Shaw. Vote unanimous. 5-0 <br /> Matt requested that the mitigation be taken out because it is not required. The <br /> commissioners agreed that would be his right as it is not required. The Agent asked <br /> for a revised plan. He reminded the commissioners that a letter from Natural <br /> Heritage is required before they issue an order of conditions. <br /> 6:18 James 1. and Ellen B. Goodman, 120 Summersea Road. Proposed NGl <br /> demolition/reconstruction of single-family dwelling, removal/reconstruction of <br /> walkover structure and pier with seasonal ramp and float, removal/reconstruction of <br /> shed. <br /> Resource Area: <br />