My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/5/1994 BOARD OF ASSESSORS Minutes
>
4/5/1994 BOARD OF ASSESSORS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2018 5:01:22 PM
Creation date
1/18/2018 9:16:11 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF ASSESSORS
Meeting Document Type
Minutes
Meeting Date
04/05/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br /> F <br /> i <br /> Board of Assessors Meeting Page 2 <br /> earip_ on Appeal for Real. Property 'fax Abatement <br /> Map 88 , Lot 51 and Map 88 , Lot 52 <br /> Prime Properties Limited Partnershi , Assessed Owner <br /> Represented by Earl Mares (present) <br /> I <br /> map 109 , Lots 20 , 211 2 , and 23. David Bailey stated that <br /> the deeds to The Town seem to <br /> e in order - there is no question <br /> on this issue. <br /> Map 103 , _ Lot 107 . David Bailey stated that this parcel has <br />' w <br /> a huge drainage easement and a lig topography problem; these <br /> findings concur with Mr. Marsters complaint. <br /> Ma 109 , Lot 2 . David Bailey stated he has a note on the <br /> plan that the major part of the lot is taken up by the road <br /> ea6einerit. Mr. Marsters added that it has a hugehole in the , <br /> middle; he presented the plan showing the severe topography <br /> proper. Lengthy discussion followed, Mr. Marsters stated that <br /> a lot of fill is required to fisc the problem. <br /> lem. <br /> Map 83 . David Bailey stated these are corner lots. Mr. <br /> Marsters stated that two are interior lots because they do not <br /> have adequate frontage - neither has 125 feet of frontage, and <br /> the road is not yet built - the lots are not yet buildable and <br /> cannot be released. Discussion followed regarding the change in <br /> some lot sizes to one-half acre and full acre lots . <br /> Map 88 , . Lots 51 and 52 . vice Chairman Porter asked Mr. <br /> Bailer if Assessing already gave these lots a percentage <br /> reduction for topography, Mr. Bailey stated that It d*.d; Mr. <br /> I Marsters claimed the reduction was not sufficient because the <br /> lots are very low and difficult to build on - the drop is almost <br /> immediate from the street - then about ten feet -- then there are <br /> wetlands in the lack. A lot of fill and some good designs are <br /> required in order to build - deeper foundations may be necessary, <br /> David Badley asked for an estimate to fill these lots . Mr. <br /> Marsters explained that retaining walls will be necessary and <br /> perhaps double foundations as well as an enormous amount of fill. <br /> The lots are now low in value, yet pre-sale is not possible <br /> preparation requiring time and money will be required before <br /> sales can be realized. <br /> Mr. Marsters stated that perhaps $15 , 000 will be required to <br /> prepare each lot. [upon question from Chairman Greig, David <br /> Bailey stated that the current assessment on Lot 51 is $23 , 800 <br /> and perhaps the same for Lot 52 . Mr. Marsters stated that the <br /> company paid only $20 , 000 for the lots; even with the investment <br />
The URL can be used to link to this page
Your browser does not support the video tag.