Laserfiche WebLink
i <br /> i <br /> CIP Committee <br /> Minutes <br /> December 17, 2002 <br /> Li br : (continued) <br /> In fiscal year 2005', capital improvement needs estimate construction of <br /> the Library building project at $4,000,000. The figure is based on the <br /> need of 20,000 square feet at the construction rate of$200 per-square foot. <br /> Friends of the Library are undertaking a capital campaign to raise <br /> $1,000,000. The balance or $3,000,000 would be the Town's-portion of <br /> the project proponent to be raised through bond appropriation. <br /> During construction it will be necessary for the Library to relocate. <br /> Operations during the construction phase of the project would require <br /> 4,000 square feet. At an estimated cost of$25 per square foot,the need <br /> for temporary space would require an additional $100,000 per year. <br /> Temporary site locations.such as the former Senior Center and the use of <br /> office trailers were briefly considered. It was agreed that the cost <br /> projections for temporary Library space would be considered a part of the <br /> overall Library building project in fiscal year 2005. <br /> Leisure Services: <br /> Gus Frederick, Director of Leisure Services prioritized the repair of the <br /> tennis court at the Quashnet School as an urgent capital improvement <br /> program need for his department. <br /> The tennis courts are utilized extensively at this location for school aged <br /> children attendir g the Quashnet and Coombs Schools. It was noted that <br /> courts located at the high school are used heavily and are not convenient <br /> for after school and sun ner Leisure Service programs. <br /> Two tennis courts and a basketball court arero sed at the Quashnet <br /> p � <br /> School site location. Estimated price quotations were received last year. <br /> The project is deemed a safety issue. Photographs were presented to <br /> depict the extent of the damage. The amount requested for a painted <br /> asphalt surface, a less expensive option for the courts is $77,000. It was <br /> noted that the surrounding-fencing is also in disrepair. <br /> The CIP Committee requested that updated price quotations be obtained <br /> for the project proposal to include new vinyl coated chain link fencing. <br />