My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/8/2004 CAPITAL IMPROVEMENT PROGRAM Minutes
>
1/8/2004 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 5:03:07 PM
Creation date
1/19/2018 11:52:11 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/08/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 <br /> IP Committee <br /> Minutes <br /> January 8, 2004 <br /> School I partnyent <br /> Mit Bus: - $ , 00 <br /> lease purchase, year 1 of a 3 year lease <br /> The mini bus vehicle would be used to trap port athletic teams, and be <br /> utilized for field trips. It would also serve as a spare van for,emergency or <br /> special needs transportation. Costs savings would result with use of <br /> smaller vehicle in lieu of full size buses and costly outside transportation <br /> fees, <br /> K.C. CoombsBathrooms/SPED: --$25,000 <br /> To conduct a feasibility study on constructing an addition to K.C.C. for <br /> .additional bathrooms and special needs.teaching-space. The additional <br /> wing or added space would provide adequate student and adult bathroom <br /> facilities, special education space and a teacher workroom. <br /> MISS Relocation: - $126,000 <br /> An explanation was detailed to describe the remodeling proposed.at the <br /> high school and Quashnet School to.accommodate the growing school <br /> population. Presently, there are-1007 students enrolled in the high school. <br /> In the 2004-2005 school year, the predicted enrllent is 1062. <br /> The renovation proposes to move the Special Education office to the <br /> Quashnet School. The office space would then-be utilized as high school <br /> admm* istrative offices by Housemasters for grade. -1 o and l 1-12. Also <br /> proposed is the remodeling of the"Art Gallery Into a functional Art <br /> classroom. The Quashnet School would he remodeled for spcial <br /> education. <br /> Enrollment figures by classroom were requested for additional review. <br />. t <br /> District wide Central Storage: -$2 ,00 <br /> To prepare a feasibility study on constructing �a building for the storage of <br /> supplies.and materials. L The building to house maintenance/custodial and <br /> classroom supplies would be.located at the high school'facility. Storage <br /> issues were deemed a concern of the School Department. <br />
The URL can be used to link to this page
Your browser does not support the video tag.