My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/22/2004 CAPITAL IMPROVEMENT PROGRAM Minutes
>
1/22/2004 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 5:01:54 PM
Creation date
1/19/2018 11:55:29 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f ti 17Za� � 'Q F{• <br /> t}• _{# �x-:,Lx-iPEE FIRE & RESCUE DEPARTMENT <br /> JAN 2 <br /> 1 M <br /> 20 Frank Hicks s rive, M s p c, Massachusetts 02649 <br /> 508-539-1454 FAX 508-5351-1453 <br /> f <br /> TO: Capital Improvement ConuyAttee x <br /> r <br /> FROM: GeorgeBaker;Fire Chief <br /> R : Revised Capital Improvement Request <br /> DATE: January 21, 2004 <br /> Please consider the following amendments to this department's 2005 C listed by <br /> priority: <br /> 1. Replace Brush Breaker: Amend from$2,00,000.00 to $30,000.00. As the <br /> committee should be aware, The Town of Mashpee has been approved for Federal <br /> Assistance to Firefighters Grant in the amount of$225,000.00. The town's <br /> required match for this grant is $25,000.00 (10%). The original project was to <br /> purchase a reconditioned chassis and outfit it with brush breaker bars, a water <br /> tank and pump. This grant is for a new vehicle. I have attached the proposed <br /> budget for the project. This is an outstanding opportunity to replace our 1964 <br /> heavy-duty brush breaker with a new 2 -year vehicle. <br /> 2. Construct Substation: It is my hope the onum*ttee will consider feasibility and ; <br /> planning money in the amount of $20,000.00 <br /> . Replace Utility: vehicle please consider an amended project cost o $49,1000.00 <br /> . PC Replacement: I will continue an incremental preplacement as our operating <br /> budget allows. This project can be deferred until a plan is developed with the MIS <br /> Director. <br /> . Rescue Boat: The project cost has not changed. $25,000 <br /> . Replace Utility vehicle: Although this vehicle is near 100,000 miles, this project <br /> can be deferred until next year. <br /> Thank you your consideration of these project. I will attempt to be at the meeting of the <br /> 22"d by 4 pm. <br /> Again, thank you <br /> 5 <br /> I/wV k+ n minimize loss and suffering within F' L u community <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.