Laserfiche WebLink
4 <br /> Capital Improvement Program Committee <br /> Minutes <br /> December 20,2005 <br /> Planning Construction: (continued) <br /> Parkin Lot!Mprovements t DPW $125,000: <br /> The project was included in the original bond, but as a result of funding <br /> utilized for other necessary projects,the reconstruction of the DPW <br /> parking lot was excluded. The existing lot has severe cracking and <br /> improved drainage is required. The project would also give the DPW <br /> expansion to park vehicles and other equipment in a safe manner. <br /> Fire Substation in South Mashpee-„$2.0 Million Bond: <br /> It was recommended that Planning& Construction meet wi <br />