My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/3/2008 BOARD OF SELECTMEN Minutes
>
11/3/2008 BOARD OF SELECTMEN Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 1:28:30 PM
Creation date
1/19/2018 1:12:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Minutes
Meeting Date
11/03/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br /> Certificate of Compliance First Request <br /> $50.00 Certificate of Compliance Second Request <br /> $100.00 Certificate of Compliance Third Request <br /> $1.50 per Abbreviated Notice of Resource Area Delineation <br /> Linear Foot <br /> **********NOTE-ADD AN ADDITIONAL 50% OF THE CALCULATED FEE WHEN <br /> THE WORK INVOLVES ACTIVITIES WMIIN A RIVERFRONT AREA************* <br /> $100.00 Continuances (where the Commission deems that a continuance is <br /> necessary because of insufficient information/unpreparedness on <br /> the part of the applicant) <br /> $50.00 Extension Permit <br /> $15.00 Readvertising of hearing notice <br /> NOTICES OF INTENT(all fees include advertising) <br /> $90.00 Category 1 <br /> $150.00 After the fact <br /> $100.00 Category2 <br /> $170.00 After the fact <br /> $260.00 Category 3 (business, commercial and/or Industrial Projects; Sub- <br /> Divisions) <br /> $490.00 After the fact <br /> Plus an additional $190.00 ($270.00 after the fact) for each increment of 10,000 square <br /> feet, or portion thereof, of building structure footprint(s) <br /> $510.00 Category 4 <br /> $990.00 After the fact <br /> $2.00 per linear ft. Category 5 <br /> $4.00 After the fact <br /> For docks, float and walkways in same axis: total linear length of structure. Where float <br /> is perpendicular to the axis of the walkway, ADD linear length of walkway and ramp to <br /> longest dimension of float. <br />
The URL can be used to link to this page
Your browser does not support the video tag.