Laserfiche WebLink
J <br /> Certificate of Compliance First Request <br /> $50.00 Certificate of Compliance Second Request <br /> $100.00 Certificate of Compliance Third Request <br /> $1.50 per Abbreviated Notice of Resource Area Delineation <br /> Linear Foot <br /> **********NOTE-ADD AN ADDITIONAL 50% OF THE CALCULATED FEE WHEN <br /> THE WORK INVOLVES ACTIVITIES WMIIN A RIVERFRONT AREA************* <br /> $100.00 Continuances (where the Commission deems that a continuance is <br /> necessary because of insufficient information/unpreparedness on <br /> the part of the applicant) <br /> $50.00 Extension Permit <br /> $15.00 Readvertising of hearing notice <br /> NOTICES OF INTENT(all fees include advertising) <br /> $90.00 Category 1 <br /> $150.00 After the fact <br /> $100.00 Category2 <br /> $170.00 After the fact <br /> $260.00 Category 3 (business, commercial and/or Industrial Projects; Sub- <br /> Divisions) <br /> $490.00 After the fact <br /> Plus an additional $190.00 ($270.00 after the fact) for each increment of 10,000 square <br /> feet, or portion thereof, of building structure footprint(s) <br /> $510.00 Category 4 <br /> $990.00 After the fact <br /> $2.00 per linear ft. Category 5 <br /> $4.00 After the fact <br /> For docks, float and walkways in same axis: total linear length of structure. Where float <br /> is perpendicular to the axis of the walkway, ADD linear length of walkway and ramp to <br /> longest dimension of float. <br />