2 <br /> Community Preservation Committee <br /> Minutes <br /> April 25, 2006 <br /> APPOINTMENTS AND HEARINGS: <br /> Catherine Laurent—Hediage Park Expansion Project: Phase I&Phase 11: <br /> (continued) <br /> The existing Well at Heritage Park does not have the capacity for further <br /> expansion and cannot be used to irrigate additional playing fields. The <br /> proposed new well pump as outlined in Phase I would be sized to irrigate <br /> the playing fields as defined in Phase II of the project proposal. <br /> In Phase I, the Department of Public works would asistt site <br /> preparation for the construction of the two fields and the well building to <br /> reduce cost constraints. The projected budget for Phase I i $192,500. <br /> The sum includes a well pump building $63,000, a sof ball baseball field <br /> $57,,000 and a multi-purpose field $72,500.' A complete breakdown of the <br /> request is detailed in the supplemental information packet. <br /> In Phase 11,the DPW would also prepare a majority of the site preparation <br /> for the construction of a softball/baseball field $55,000, a multi-purpose <br /> field $69,500, a parking lot; 100-11 o spaces $ 0,000, a picnic area.and <br /> walkways $89,500 and middle pang lighting and screening $85,000. <br /> The total projected cost for Phase lI is $379,500. <br /> The project has gained support from a variety of youth sports <br /> organizations. This year, 46 little league and softball teams or an <br /> estimated boo youth in baseball/softball intend to use the playing fields. <br /> In soccer, there are approximately 160 players. The demand for practice <br /> and playing time is evident as students often play at other site locations or <br /> cancel games or practices due to scheduling conflicts. <br /> Discussion followed with respect to the cost for children to participate in <br /> youth sports and sponsorship to those unable to assume the costs. It was <br /> noted the fall soccer program has granted scholarships in the past to <br /> families lading the ability to pay. <br /> Presently, Phase 1 $192,500 and Phase 11 $379,500 amount to $572,000. <br /> A potential cost savings in construction activities such as irrigation may be <br /> realized if the project proposals were combined. <br />