Laserfiche WebLink
MASHPEE ARCHIVES <br /> S <br /> PROJECT BUDGET <br /> Engineering/Design <br /> $20,000 <br /> 8-10% construction costs (industry standard) <br /> HVAC Climate control 0000 <br /> Boiler replacement Item 1, MECH, Capital Needs Assessment) <br /> $5,000 <br /> New HVAC (Email dated 10-27-10 <br /> $30,000 <br /> Window Replacement $59000 <br /> Window replacement (Item 3, ENV, Capital Needs Assessment) <br /> $5,400 <br /> Sprinkler/Fire Alarm System <br /> $269000 <br /> Fire alarm upgrade (item 6, ELEC, Capital Needs Assessment) <br /> $10,000 <br /> Sprinkler installation Email dated 10-28-10) <br /> } <br /> $168000 <br /> Basement Waterproofing/Roof Drainage Repair <br /> $20,000 <br /> Roof downspouts item 7, AITCH, Capital Needs Assessment) <br /> $3,000 <br /> Waterproof basement (item 8# ARCH, Capital Needs Assessment) <br /> $1,500 <br /> Mold remediation (Item 9, AITCH, Capital Needs Assessment) . <br /> $5p00 <br /> Bulkhead roof(Item 4, ENV, Capital Needs Assessment) <br /> $10,000 <br /> Electrical Upgrade $2%000 <br /> Service upgrade (item 1, ELEC, capital Needs Assessment <br /> $5,000 <br /> Interior lighting replacement (item 2, ELEC Capital Needs Asses) <br /> $8#000 <br /> Emergency lighting item 3, ELEC, Capital Needs Assessment) <br /> $2,000 <br /> Receptacle installation (Item 5, ELEC, Capital Needs Assessment) <br /> $2, 00 <br /> Archival Storage/Display Units $259000 <br />