Laserfiche WebLink
page I of 1 <br /> Catherine Laurent <br /> From: Dom Puniello [dorn_punieIlo@g-g-d.cornJ <br /> F <br /> Seat: Wednesday, October 27, 2010 10:37 AM <br /> F <br /> To: Brad Tripp <br /> Co: Catherine Laurent; Louie Vieira <br /> Subject: Re: Mashpee Archives <br /> Brad,, , <br /> This cost covers some bathroom ckhaust fans and associated make up air b y a small AHU. <br /> t <br /> Ventilation and tempering for documents would be a higher cost.. Probably in the 25000 to <br /> 30,000 dollar range for both floors. <br /> Thanks k <br /> Dom <br /> Seat from my iPhone <br /> On Oct 27, 2010, at 10:24 AM, Brad Tripp <t .mamas i m .LYov> wrote: <br /> Dominick, <br /> For the Archive building you recommended "ventilation air system be installed in the � <br /> basement with additional air conditioning and' make up ventilation to provide improved <br /> humidity control" at a cost of $7500. At this terve we are looking for a rough budget figure, is <br /> $7500 enough? told we need to do anything upstairs as-well, our goal is document <br /> preservation. <br /> Tans, <br /> Brad Tripp <br /> -Town of Mashpee <br /> Facilities Supervisor <br />