Laserfiche WebLink
7 <br /> Commumty Preservation Committee <br /> Minutes <br /> June 7. 2011 <br /> Review ofCPA, lid r October,2011 Town Meet- <br /> DPW/Friends <br /> t-i w fends of Santuit Pond—Santuit Pond Resta tion Project: (continued) <br /> Prior to discussing the application before the CPC, Ms. Laurent indicated for the <br /> record,the CPA project requests funding for a solar power watei circulator. The <br /> eject is not specific to the SolarBee. ibis. Laurent indicated the Town of <br /> Mashpee is subject to the procurement law,and if the project is supported would <br /> conform to municipal bid performance standards. <br /> Being a new concept,the DPW and FSP/MEC were asked if other aeration <br /> systems were considered when preparm" g the application for the remediation of <br /> Santuit Pond. A CPC member independently researching the project via the <br /> Internet disclosed there may be other alternatives to consider for remediation. For <br /> an example and as an alternative, an independent web-search found the site; <br /> Clean-Flo Restoration which uses electrical power to provide circulation vs. the <br /> use of solar powered circulation. The system is contained by underwater piping, <br /> and operates regardless of the weather. In reviewing this system,it was found the <br /> company previously conducted an assessment of Santuit fond. <br /> In response,Mr. Waxman indicated the proposal was formerly considered. <br /> However,there were several drawbacks which include the expense of the rental <br /> and electrical costs,and the potential for vandalism. The concept introduces <br /> o Ygen at the bottom of the pond. It was noted the average depth of Santuit fond <br /> is 5'. The Clean-Flo system would require thousands-of feet of hose,a <br /> considerable amount of ventilators., and the installation of hi <br />