My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/13/2012 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
>
11/13/2012 COMMUNITY PRESERVATION ACT COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 5:05:17 PM
Creation date
1/24/2018 2:06:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
COMMUNITY PRESERVATION ACT COMMITTEE
Meeting Document Type
Minutes
Meeting Date
11/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> Community Preservation Committee <br /> Minutes <br /> November 13,201 2 <br /> CPA lieation—H Park&Tigpr.Long,PlaygMund.IMRLovements: <br /> p licant: DPW;Co-applicant: Re rea op_ evert: (continued) <br /> Discussion followed regarding the concept of a water play area for children <br /> through ground spray and above ground'features. It was agreed that mer <br /> information relative to pool regulations,water testing and projected annual costs <br /> would be provided and reviewed by the CPC Cottee at their January meeting. <br /> It was noted the CPA does not provide funding for maintenance costs. <br /> The second component of the application would provide funding to improve the <br /> irrigation system at fields 1-3,the origV lag fields constructed at Heritage <br /> Park. CPA funding would allow for the repla rnent of the irrigation control <br /> system. The current control system allows for only 1. schedule for aU 34 zones. <br /> This results in a 12-hour operation cycle. A new control unit would allow for <br /> multiple programmmg of the different zones to conserve water and better <br /> accommodate the fields, especially the lighted field. <br /> CPA&plication—CgMWumV Park fie- relo er : <br /> Applicant: W Co-go cant: Memorial Park C <br /> Catherine Laurent, Director of Public Works was in attendance to discuss the <br /> CPA application submitted by the DPW and Memorial Park Committee proposed <br /> for the May 2012 Special Town Meeting. The funding request is $2 10,000. <br /> The total cost of the Community Park .e-development project is $425,OW. <br /> Through other sources,the town has funded seven site improvements. This <br /> includes the construction of the parking lot,and the access ramp to the Archives <br /> building. Funds within the existing town budget will support the remainder of the <br /> improvements to the parte lot, and funding to secure an architectural design for <br /> the Community Park incorporating the elements of the project proposal, <br />
The URL can be used to link to this page
Your browser does not support the video tag.