Laserfiche WebLink
February , 1993 <br /> Page 3. <br /> Mr. DiGregorio advised one year ago they were before the board to take down the <br /> dwelling and garage and construct a now house, This has not been done due to the <br /> situation with the Popponesset Bridge. Mr, wachtenhei,m has a physical handicap <br /> and cannot use stairs, which lits his use of the property. The structure is <br /> 142 feet out to the last float to get sufficient water at low tide for thein 17 f t, <br /> Whaler; there is one foot of water below the prop at low tide. From the existing <br /> stairwell seaward, the fixed 30 foot long pier ends in a► 16 ft. seasonal ramp and <br /> 180 s.f. floats. The total length from Mean High Nater is 95 Meet. They went <br /> through Board of Appeals for a special permit and variance. <br /> Mr. Homeyer asked if stops would be used to keep it from bottoming out? Mr. DiGregorio <br /> advised it is not necessary because they got the variance. Asked if there would b <br /> five feet of head- room at low water, he stated there would b . <br /> Mr. McNevish advised no work will be done directly touching the salt marsh. There <br /> is a staircase to allow access to the beach. Pilings wi <br />