Laserfiche WebLink
i <br /> Conservation Commission <br /> February,1 , 1993 <br /> Page 6. <br /> Mr. Hayes advised there will be no disruption of the coastal bankther than minor <br /> repair of the two small areas of settling. Because the concrete blocks act as a <br /> stabilizing device in the areas Of collapse, it will be necessaa to correct this <br /> i4aFoama"ke4sUu1rew&tLhQat <br /> t will - ent an of 'thin <br /> t does riot come "-umLLUw..dQ=., The grout <br /> OnIlLyhig 11 ed to stabilize the upper revetment for when they put the fiat <br /> roc under the c c.y. o as going ff <br /> Misting order they have for the upper revetment X11 not <br /> be put down independently but in conjunction w.ththe rebuild of the wall. <br /> Mr. Sherman asked if that amount would be no more than what would have been put down <br /> under the existing order? Mr. Hayes stated that was correct. Mr. Sherman asked if <br /> the survey plan reflects existing conditions or is a compilation? Mr. Hayes advised. <br /> the lower one reflects existing conditions, <br /> Mr, Sherman could not tell from being <br /> up there the other day whether the disturbed areas to the west are going to be repaired <br /> s part of this project; there were no stakes in the ground, at the golf course end. <br /> M . Hayes stated at the upper portion of the bank there is approximately 30 feet; <br /> that is part of this, <br /> Mr, Sherman stated there are three existing paths that should be closed off between <br /> the acre sway and the revetment through the dunegrass. Mr. Hayes stated he would <br /> have to talk to Michael Grotzke about this as it is 'off the property. <br /> . Sherman would like to meet n--site with Mr. Hayes to go over these things prior <br /> to issuing the Order of Conditions. Mr. Hayes was amenable. It was agreed to meet <br /> during the next week. <br /> Mr. Homeyer asked if they were doing a double row of toe stones? Mr. Hayes stated <br /> because of tidal restrictions they have a maxmmn space of between 22 and 30 f6et. <br /> They will come back for maintenance every gree years. They will want to complete <br /> construction prior to May 1 . <br /> Mr. Shermanstated the Commission could close the hearing after sign-off by the Cape <br /> Cod Commission. <br /> Mr, Hayes advised under SE 43-395, Tidewatch has managed the stabilization of the <br /> coastal bank at the access ramp. This ramp has been used by every construction <br /> company doing work along that reach. Tidewatch will probably repair that but in <br /> the future, if that access is going t be used, suggested the C�on�nission take <br /> steps to protect that as the benefits of Tidewatch#s labor is being uWacted by <br /> others who do not take it as seriously as they do. If there is damage to that in <br /> the future, he would ask the Commission to -make this part of the order. They will <br /> repair this as part of this filing. <br /> Mr. Homeyer asked if he was requesting that in the future anyone using this access <br /> be rade responsible for maint ithe access? That was correct. <br /> Mr. Sherman agreed that it has not been handled carefully .by others. <br /> Mr. Hayes advised he wild. be coming in again with permitting protocol for the Adams <br /> Notice of Intent. <br /> Public comments were requested; there were none. <br /> =: Motion made and seconded to continue to March 18, 1993 - 8:00 p.m. <br /> CONTINUED To BCH 1 , 1993 - : o p.m. <br />