Laserfiche WebLink
Conservation Cossion <br /> February 27, 1992 <br /> Page 6. <br /> Mr. Sherman advised the gas company has already gone in and has placed gravel instead <br /> of reseeding. They will be on the opposite side and will be Within 1' of the edge <br /> of the road. <br /> Mr, Rich advised % of the run will be 2 feet into the blacktop. Backfilling will <br /> be done immediately. work is to start mid-April; whole project by raid-summer. <br /> Mr. Shennan stated temporary haybales may be needed in some areas. Silt screens do <br /> not work in that area with .the wind. He asked bow long from start to fi <br />