My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/27/1992 CONSERVATION COMMISSION Minutes
>
2/27/1992 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 5:06:06 PM
Creation date
1/26/2018 11:23:30 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
02/27/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Conservation Commission. <br /> Feb nary 27, 1992 <br /> Page 9. <br /> -Mr. Borselli stated -there would ,be a lot of activity but -the crane moves very slowly. <br /> y <br /> Mrs. Simmons suggested they go in by barge. <br /> Mr. Borselli stated there are no other alternatives -to work dere. The same method has <br /> been suggested by three .companies contacted.. The salt marsh is very sparse i - the <br /> area. This is- aboeMe High water. The te� trtes_ p� the site are <br /> after the wall is bu t, ti er t r` -�11 h .i t rer ��.r r t.n r meet up <br /> with the stair -� .e ewwi-1-1� eT a -t-i g�o i .t <br /> yti-:� 1: yeas- - h Cod �:t <br /> wall at the cap stone. There are some other areas in the front shown in green on the <br /> plan, adjacent to Daniel's Island Load. They would like to plant rhododendrums and <br /> hemlocks. It is Within 100 feet of a coastal -bank. Russian,, -i�re� n l--.- ach� l n <br /> are proposed in areas of the access. A storage hed�is-re est-ed-for-trash-barn le . <br /> ` There is an existing post and rail fence that has reached its life expectancy and <br /> does not match in with the picket fence; they would like to replace it 'With picket. <br /> Mr. Sherman did not see. that' as a problem. The Cormssion will need to know whether <br /> or not the client will go along with the evaluation.. <br /> To be continued vending rceipt of DEP number and comments and ag're'ement for the <br /> Wildlife Habitat evaluation'. Shellfish Garden should be- asked to look at this also. <br /> GBDRGE FRIM: The agent give a reprise of the situation. Mr. Viprino is the con- <br /> tractor for Zaki Abdun-Nabi. An emergency certificate was issued but the work exceeded <br /> .50%.* There- was a filing and an Order of .conditions issued. A letter was received from <br /> Mr. viprino that.he had read- the Order. <br /> Mr. Sherman stated he went to the site and work had begun. - The IEP number was not <br /> displayed, there was no Order of Conditions on-site. and there was supposed to be a = <br /> meeting -site. before the work-began. He stopped them from .working. Mr. viprino ` <br /> asked if the on-site evaluation could be dome t that p int- and was -told it could not:, <br /> Mr. ] e'sroslers advised Mr. Sherman called him to advise of the situation. He stated <br /> he had plans right up to the weekend. -He hien directed Mr. Sherman to invite George <br /> viprino to come in to speak with the Commission. He t ok a quite strong stand that <br /> if these conditions continue, he would want to follow up on that and not permit'you <br /> to work in any wetlands in town, ' <br /> Mrs. Simmons asked if this is the .same contractor who did Hendler? <br /> Mr. Vipri-no asked what violation is so upsetting? <br /> Mr. Desrosier advised there is some extensive overdredging ori the Hendler property. <br /> Mr. Sherman stated Shellfish had stated it was not done under his direction and some <br /> areas of soft shell- clam population were disturbed. <br /> Mr. viprino advised Wayne Colson is chairman of a conservation corn 's ion. He had <br /> asked the operator of the equipment and he stated the shellfish warden told him where <br /> to dig. He saw dig marls down there. He taped with Bob Sherman and there was some <br /> questions of dredging. Wayne Colson would not do anything like that. <br /> Mr. I esrosiers stated the co fission 1s faced with being asked to take the word of the <br /> operator over the word of the shellfish warden. <br /> Mt. viprino stated he was at the site waiting for a delivery; he got there about 3:00, <br />
The URL can be used to link to this page
Your browser does not support the video tag.