Laserfiche WebLink
E <br /> Conservation Colluld ssion <br /> May 9, 1991 <br /> Page 4. <br /> VOM: Notion made and seconded that re-issue be charged at $20.00 per re-issue. <br /> Unanimous Vote. <br /> DockFee: <br /> M: Lotion rade and seconded that filing fee for docks be increased t <br /> $3.00 per linear foot, Unanimous Vote. <br /> X12 Submissions must be by Certified Mail* <br /> Mr. Sherman stated the 1 to 4 slope ratio has been incorporated which can b <br /> substantiated by scientific studies, <br /> Additional Submission Requirements <br /> 2 e Change: Aerial photos may also be provided In lieu of plan -- deleted) . <br /> Changed. to K: _ <br /> New J: Bubblers and hydraulic lifts_ must be shown and information provided. <br /> Advise how installed and how to be used. (Should be conditioned). <br /> #26: Auer public access, add: For fishing, fowling and navigating only. <br /> Page' 4. , Add: Where frequent changes to the consistency of the slope i <br /> occur, additional cross sections may be required at the discretion of the Agent <br /> and the Commission. <br /> To be checked with the Building Inspector for heights and mandatory <br /> engineering. To be discussed later. <br /> 21; No herbicides or chemicals to be used. <br /> #32: Page 6. , Add, after Registered Land Surveyor, "or.one licensed by the State <br /> f Massachusetts I$. <br /> -.bested Crossings: , The Mate makes allowances - not included, but not precluded. <br /> Miscellaneous: <br /> The Corn d sion should learn new methods for erosion control.. <br /> Submittal requirements for RDA's will be referenced in the re s. <br /> Checklist t be included in the package for applicants to refer to. <br /> Administrative Review fronto be made up. It was suggested an area be allowed at <br /> the bottom for the decision. <br /> Public Hearing on the Regulations to be scheduled for .June 6, 1991 at :30 p.m. <br /> Other business to be conducted afterwards, <br />