Laserfiche WebLink
KkTMM ATICMqffSSIT <br /> UL <br /> motes of .hate 13, � <br /> 1991 i <br /> �1 <br /> JM 2 4 1991 { <br /> Ccomissicmers resent: Patrick Coffey, Gertrude Siam , Renee-F} d_ l -- <br /> Harry Desrosiers Frani Homeyer L L a Mjo I <br /> The meeting was called to order at 6:30 p.m. <br /> BEARnU ON FPS CM&)XW IN <br /> New Fee Schedule <br /> Fees now incorporated .mato the regulations. <br /> Dock Fees - $3.00 per linear Foot. <br /> Motion made and seconded that fees and submittal requirements are t <br /> be instituted on ,duly 1, 1991. Unanimous Vote. <br /> Reg. #1 - Incorporated- into the new one. <br /> i <br /> F eg. # - replaced by submittal requirements. <br /> M draft referencia slope ratios for defining <br /> g 1 ' a coastal bank adapted as , <br /> voted. (Town Counsel to draft wording for a waiver when there are no alter- � , <br /> natives existing and best available technology has to be used) . <br /> a <br /> It was agreed some mirdXM must be ensured with a buffer. <br /> #1 - changing definitions showing an and bank. <br /> ADi1NI TRATIW REVIEW: Has been used as a policy. there is none under the act <br /> only under the bylaw, Town Counsel approves of the concept. Charge to remain <br /> at $30.00. <br /> Gerald Epstein quagticred replication requirement prescribing it be done at <br /> to 1 ratio and asked if that is an established ratio? <br /> Mr. H me er stated i t is what is recommended. Also recommended is a bond be <br /> pasted prior to start of project at $10 a sere foot for replication. <br /> Mr. Epstein referred to the statement that the commission is asking for a <br /> wetland scientist with qualifications acceptable to the commission to be <br /> present at the t;me and asked if there is a list of acceptable people. <br /> Mr. Sherman stated there is no certification for wetland scientist, only <br /> reputation and experience on our part. The murission would have the right <br /> to refuse. <br /> Mr. Epstein felt the bonding requirement of 15 years is excessive. Some <br /> developers are not around for 15 years. <br /> Liz Epstein suggested including in the Certificate of Compliance a perpetual <br /> condition for the commission to have access for inspect-ion. <br /> (19A) : Motion made and seconded to charge the. bonding period to fire <br /> years with inspection at 5,, 10, and 15 year intervals by the commission <br /> to be referenced in the Order of Conditions and Certificate of Cmpliance. <br /> Unanimous Vote. <br />