Laserfiche WebLink
AV Conservation Commission <br /> June 27, 1991 <br /> Page 4. <br /> Public coments were requested and there were none. <br /> VOM: Motion made and seconded to find a negative determination. Unanimous Vote. <br /> N. <br /> 8:45 T DORS R. MUSTO for a Determination of Applicability on a- proposal to <br /> repair a r x I ' existing dock, no work to be done below the water line, at <br /> 104 Fells Pond road. Abutter receipts were presented. This is an existing <br /> gook in meed of repair, placing of a new top. A sledge hamnier will be used <br /> to redrive the piles. <br /> Mrs. Simons referred to slash/debris on the right hand side of the bank and <br /> stated she would net want that to occur again. To replace the timbers on the <br /> steps will require an RDA. <br /> Mr. shernan stated performance standards are ret, the boards should be replaced <br /> with a gap between to -allow light penetration to vegetation -below. <br /> VOM: motion made and seconded to find a negative determination. Unanimous vote, <br /> NEGATIVE J' rON <br /> �r71�rE <br /> DON M <br /> O : Abutter receipts were received. The Order of Conditions was <br /> issued under 131.40 but open under the bylaw pending receipt of sane. <br /> M: Notion made and seconded to close the hearing under Mashpee 'down Bylaw <br /> and issue an order of conditions to coincide with the one issued under <br /> the State. <br /> A RAKING: New Seabury has requested beach raking be continued on t <br /> Maushcp village and Rock Landing Beach areas. <br /> Mr. Sherman stated BBB should be contacted re an Amended RDA. <br /> Ms Lannik stated, if they are separate entities, they should come in before the <br /> Board with their own RDA. There may be other issues. <br /> D� POS: Dan Buckley has requested cutting of vegetation on the pondward <br /> side of Deans Fond. The agent met theme today with him and Bilis Allen who wil1 <br /> write up an explanation of how it should be done. This will be done as an RDA. <br /> Ron B nvie came before the commission concerning his request for an <br /> extension, lir. Sherman suggested extending the order but holding it until he <br /> speaks with town counsel. Ms Lann.ik agreed the extension with conditions was <br /> proper. <br /> Remedial measures have been completed and a trench made around the wetland. <br /> 200 haybales are being installed tomorrow. They will have to be maintained <br /> and the trench may have to be dug again after a rains torn . <br /> Suggested conditions were reviewed and. Nr. Bonvie was in agreement with them. <br /> No later than October 1 a hearing will be held for an amended order for lon <br /> g <br /> tern maintenance. <br />