Laserfiche WebLink
Conservation Commission <br /> August 2 , 1990 <br /> Page 2. <br /> Mr. Humphries stated there are five resource areas included on the properties t <br /> some degree. The comumon resource area on each property is the coastal beach, coastal <br /> dune, coastal bank and land subject to coastal storm flowage up to elevation 12 on <br /> the Nantucket Sound side and elevation 11 on the Deal's Pond side. The only other <br /> resource, which only applies to one lot, is the barrier beach on lot 1379 in an <br /> area where nothing is proposed at this time. <br /> They have found with regards to Lots 1378 and 1377 that there is a role being played <br /> geologically by windblown sands moving landward from the coastal dine and providing <br /> veneer of sand over the coastal bank. The main origin of the geology in the <br /> Popponesset Bluff area is sandy loam, pitted plain deposits, found in exploratory <br /> work in relation to the septic systems. The sensitivity of the area along the <br /> Nantucket sound side must be addressed. <br /> On the Dean's Pond facing side, the loo year flood comes up to and intersects a <br /> slope above which there is an obvious break that varies somewhere between elevation <br /> 12 at the northern part of the site up to approximately elevation 22 at the southern <br /> end. Primarily, the activities proposed in the Notice of Intent will include two <br /> driveways, a cobblestone egress ramp and a retaining. wall, only located in two of <br /> the resource meas, on the coastal bank and land subject to coastal storm flowage. <br /> Elevations for the loo year storm were clarified: elevation 12 on the Nantucket <br /> sound side and. elevation 11 on the Dean's pond side. The elevation variance from <br /> 12 to 22 is the top of 'bank. <br /> Performance standards looked at are confined to 10.30 . The 8ther- <br /> p - <br /> formance standard on a coastal bank refers to wildlife habitat and this is not <br /> shown on the habitat map. Therefore, performance standards and 7 are ghat <br /> they looked at. A letter will be provided that addresses the performance standards. <br /> Activities to be discussed tonight include removal of portions of the coastal bank, <br /> filling of a coastal bank and grading and raking. Primary concern for ensuring <br /> stability of the coastal bank relates to the construction process, the sequencing <br /> of how that material is either removed, filled, graded or raped on that coastal <br /> bank. <br /> Measures have been taken in this proposal to address drainage and to get it into <br /> the ground as quickly as possible and not to have adverse effects on the stability <br /> of the bank. <br /> Mr. Sherman pointed out that under the regulations for the Town bylaw there i's a <br /> Presumption of Significance for wildlife habitat that may have to be addressed for <br /> the coastal bank. <br /> Mr. Abrahamson advised they are trying to set up a limit of site development;- <br /> terraces, flowers, nothing can legally go forward of that lime. Pacing -Nantucket <br /> sound, they would like to maintain the open lawn duality. They came up wi <br />