Laserfiche WebLink
; Conservation 6mmission <br /> May 31 , 1990 <br /> Page 9. <br /> r. Sherman advised they have a pre-existing dock and it should be shown on the <br /> plans, the size and where it is located. <br /> Mr. Coffey requested certification of the disposal of the asphalt. <br /> Burton Kaplan,an, -a friend of the Larkins, was present and advised Tavares is doing <br /> the work and can provide certification. <br /> Mr. Coffey asked if Grasscrete will work without grass. <br /> Mrs, Simmons stated It can be planted with ground cover. <br /> CONTINUED To JUNE 282 1990 - 8:30 P,M, <br /> 9:30 Daniel Keo an & PhillipSheridan, for a Determination of Applciability on a <br /> proposal to remove two trees, landscape the front and right side of house at <br /> 6 Little Neck Lane. Dan Keo- han presented abutter reci pts. Two trees were already <br /> down when Mr. Sherman was there; one had a disease. Overgrown bushes were removed <br /> and replaced with new. Photos were shown. it is 98 feet to the coastal hank. <br /> Mr, Sherman advised the trees actually were on the bank and asked if the Commission <br /> wants replacement species for the trees taken down? <br /> Mr. Burns -asked if there were stumps in the ground and was told there are. <br /> Mrs. Simmonsstated if the bank is fairly stable, they do not need to be replaced. <br /> Mr. Sherman stated, under the wildlife habitat, he would lie to see a few shrubs <br /> put in the area and suggested low hush blueberries. <br /> VOTE: Motion made and seconded to find a negative determination. <br /> They will call when planting the shrubs. } <br /> NEGATIVE DETERMINATION. <br /> 9:45 -H CAMP FA LEY, to replace/upgrade an existing tiered retaining wall <br /> system and add 6 yards of beach sand to beach area at 615 Main St. , Pte. 130. <br /> Mike Campbell presenting, It is a collaborative program through cc child <br /> Development Program. Filing fee was waived. The proposed work will be smaller <br /> than the existing system of railroad ties in need of improvement due to erosion. <br /> Mr. Sherman asked hour close to the edge the sand will be placed. <br /> Mr. Campbell advised 3 inches in front of the tiered system .to the water's edge. <br /> M . Sherman advised if they get into the Mean Annual Flood level , they would be <br /> in the area of a Notice of Intent. <br /> Mr. Campbell advised sand is optional . The water level is closest to it's highest <br /> point right now. if aµ consideration of a level of added difficulty, he could <br /> delineate the Mean Annual Flood level . He sketched in and initialed a 2 inch <br /> margin for the sand. fork will he done by hand. <br /> Mr. Sherman auestioned the eistina dock and recuested pictures and dimensions_ <br /> VOTE: Motion made and seconded for a Neo tie findin . <br />