Laserfiche WebLink
Order of Conditions <br /> Crosby's <br /> 1 he house shall be built in compliance with plot plan of Ralph E. Crosby, et ux, <br /> October 4, 1919, submitted by Holmes & MeGratht Inc. , drawing #2 -3, sheet 1 of <br /> 30 <br /> 12. The emoval of the existing asphalt driveway shall be allowed as shown on said <br /> plot plan] all debris should be removed from site. <br /> ka .le's <br /> 11, Proposed seawall shall be constructed parallel to the waterway Spoon Drift Cove) <br /> - eliminating the so-ocalled spit of land which extends into Spoon Drift Core. <br /> 12. Seawall abutting Stauffer property SE43-104 shall be contiguous* <br /> Seawall abutting property of Hells Steiner dot #9shall be anchored and re- <br /> turned toward the upland. <br /> 140 Shellfish ish shall b lifted and relocated as near as possible to its natural site. <br /> Alcorn <br /> 11. In compliance with Title 5 and Board of Health bylaws. <br /> 12. A proposed deck shall be limited to 10 x. 24% <br /> T Sandler's <br /> 1 ., In c ompl ianc a with plans as submitted. <br /> Mir,, P61itiv 0� 100 <br /> . Hennigan filed a letter the selectmen stating that we were behind times and <br /> ho Omer of Conditions is to be involved because we did not act within the proper <br /> amount of ti e. <br /> The board acted upon this on the twenty,,first day statim that they were waiting for <br /> architectural review approval.. <br /> Fergus <br /> Issued Cease and Desist. Came in during 1978. <br /> He is building a house. There is a complete cellar. All the framing is in. The <br /> house is about 6 feet in front of both the other houses. It is not only on-.the beach <br /> but i 'is in the beach. But, number one, he should have renewed because It is over a <br /> year. Secondly, he is in violation of Wetlands. <br /> Wayne: Does he have- building permit. <br /> Pauline: He has a building and septic permit. <br /> hrlest The only grounds that we have is that his application is not valid. He has <br /> not renewed. <br />