Laserfiche WebLink
Charles: I would assume that all three holes were made at the same times They all <br /> look the same. <br /> Tien i We did not make any holese <br /> iia s Itwasn't a backhoe in other words? <br /> Charles: No, this was a rectangular hole. <br /> Pauline: The hole was oval shape. <br /> Wayne: 1 haven't seen it myself. <br /> Pauline: Myo any other questions From the board? <br /> Wayne: How much fill? <br /> Tim: on this lot here (referring to 271 we'll need goo cubic yards, <br /> a e: In other cords, 1400 for both lots? <br /> Timi No. 1440 is on 43, 1460 cubic yards. <br /> Charles t What will the distance be from the leaching tank on 43 to the high water <br /> mark across the road? <br /> - TimWell in excess of 100 feet. <br /> Waynet Are you going to use railroad tie cribbing? <br /> im t Yes. <br /> Jim: Is it necessary? <br /> Tim: There is 2 foot rise dere., The steps are -2 et;=4- t� is mere r for -lan ca i �g <br /> purposes to hold the soil in Place. <br /> Pauline What's the footage? <br /> Waynes 78 feet from the main house and 65 feet from the deck. bot 271 is 65 feet <br /> from the mean high water. Looking at the plan asks: What are these little hash narks? <br /> Tims That just shows m airs h grass, <br /> Paul in s Any Ether questions? <br /> Wa : Is this one going to require any cribbing in the back? Is there going to be <br /> any vegetation? <br /> limi h sure. I think we spelled it out well in the application of notice of intent, <br /> It is well written out. <br />